What BC Hydro actually does (and why it isn't split in two like Alberta)

If you've moved to British Columbia from Alberta or Ontario, the first thing to know is that BC Hydro is a single utility, not a split distributor-and-retailer arrangement. It owns the dams, the long-distance transmission grid, the local distribution wires, the meter at your address and the customer contract. One company, one bill, one rate schedule approved by the BC Utilities Commission (BCUC). There is no separate retailer to choose.

The historical reason is that BC's electricity system was built around large publicly-owned hydroelectric projects on the Peace, Columbia and Bridge rivers. When other provinces unbundled their utilities and introduced retail competition in the late 1990s, BC kept the integrated Crown model and instead asked the BCUC to set rates and service standards transparently. The result is that residential rates are among the lowest in North America (about 9.5 to 14 ¢/kWh on the standard two-tier residential schedule) but you have no choice of supplier for the energy itself.

BC Hydro does everything
Generation + grid + retail
  • Generates electricity (mostly from large hydro dams)
  • Owns the wires, poles, transformers and meters
  • Restores power after outages and reads your meter
  • Bills you for the energy and the delivery on one statement
You don't choose a retailer
No competitive market in BC
  • ×No "switch retailer" decision to make for electricity
  • ×No RRO, no commodity contracts, no fixed vs variable plans
  • ×Rates are set by BCUC after public hearings
  • ×The only way to a different utility is to live in another service area

Where BC Hydro delivers power

In plain words: if you live in British Columbia and you're not in the FortisBC Southern Interior service area or one of five municipal utility territories (Penticton, Summerland, Nelson, New Westminster, Grand Forks), then BC Hydro is your provider. That covers about 95 % of the province by population: all of the Lower Mainland, Vancouver Island, the North, and most of the Interior.

~1.1M km²
Land area served
About 95% of BC
~4.4M
People served
Across the entire province
~2M
Customer accounts
Homes, business, industrial
~97,000 km
Power lines
Transmission + distribution
Covered by BC Hydro
  • Lower Mainland: Vancouver, Surrey, Burnaby, Richmond, Coquitlam, Langley, Delta, Maple Ridge
  • Vancouver Island: Victoria, Saanich, Nanaimo, Courtenay, Campbell River
  • Interior: Kamloops, Kelowna (except FortisBC area), Prince George, Chilliwack, Abbotsford
  • North: Fort St. John, Dawson Creek, Smithers, Terrace, Prince Rupert
NOT covered (use these instead)
  • South Okanagan, Boundary & West KootenayFortisBC Electric
  • PentictonCity of Penticton
  • Summerland, Nelson, Grand Forks, New Westminster → their own municipal utilities
  • Sonoma Pines (West Kelowna), Sun Rivers (Kamloops) → private community utilities
Cities and regions inside BC Hydro's territory
Vancouver Victoria Surrey Burnaby Kamloops Prince George Nanaimo

Not in BC Hydro's territory? Pick your distributor

Not sure which one? Check the top of your most recent electricity bill: the utility name is printed alongside your account number.

How BC Hydro's residential rates work

Because BC Hydro is integrated (generation, transmission, distribution and retail under one roof), your monthly bill is much simpler than in Alberta. There is no separate "delivery" half to compare against the commodity. Instead, BCUC-approved rate schedules combine everything into a single per-kWh price that depends on how much you use, plus a small fixed daily basic charge. The schedule everyone defaults to is Rate Schedule 1101: Residential Conservation Rate.

Basic charge

A fixed amount per day (around 21¢ at the time of writing), regardless of consumption. Covers metering, billing infrastructure and customer support. Adds up to roughly $13 over a 60-day billing cycle.

Step 1 energy charge

Applies to the first 1,332 kWh of consumption in a two-month billing cycle (roughly the average household's baseline usage). A relatively low per-kWh rate, indexed annually.

Step 2 energy charge

A higher per-kWh rate on every kWh above the Step 1 threshold. Designed to nudge heavier consumers toward conservation and to recover marginal generation cost.

Rate riders

Small temporary adjustments (positive or negative) that true-up past forecasts or recover specific approved capital costs. The deferral-account rider has been the headline rider in recent years.

BC Hydro charge to municipality

A regulated franchise-style charge that some municipalities add as a percentage of the electricity portion of the bill. Goes to the municipality, not BC Hydro.

GST & PST

Federal GST (5 %) and the BC Provincial Sales Tax on residential electricity (currently 0 % under the residential exemption). Applied at the bottom of the statement.

Rate Schedule 1101 has been in place since 2008, when BC Hydro switched from a single flat residential rate to the two-step inclining block. The threshold is set at roughly the median household's bi-monthly consumption so that about half of customers stay entirely in Step 1. Heat pumps, electric vehicles, large pools and electric heat in a poorly insulated home are the four most common reasons households tip into Step 2 territory month after month.

BCUC publishes every approved rate change on its public registry and runs a public hearing each time BC Hydro files a revenue requirement application. Submissions from intervenor groups (BC Old Age Pensioners, the Commercial Energy Consumers Association, the BC Sustainable Energy Association and others) shape the final decision. The current rate schedule is on the BC Hydro rates page.

Contact details: emergency line first

For non-urgent questions you can also use BC Hydro's online channels: the live outage map, the corporate site, the MyHydro online account portal, or text the keyword "OUT" to 74633 (POWER) from your registered mobile number to report or check an outage at your address.

Report a power outage

If your power is out, the fastest path is to call 1-888-769-3766, report it on the online outage form, or text "OUT" to 74633 from your account-linked mobile. The dispatcher logs the address, cross-references it with field telemetry, and assigns a crew if the cause isn't already identified.

How it works: from your call to power back on
1
You report it

Call 1-888-769-3766, use the online form, or text OUT to 74633. Have your address + account number ready.

2
Dispatch confirms

The system pinpoints which substation or feeder is affected and assigns a crew or pole patrol.

3
Crew restores

Estimated restoration time appears on the live outage map. Urban faults: minutes to a few hours. Remote / storm-wide: longer, often via helicopter patrol.

4
Service back

Power is verified at the meter. Reset clocks, check freezer, and report any damage right away via the Customer Damage Claim form.

BC Hydro publishes its reliability performance to BCUC each year. The two headline metrics are SAIDI (average minutes a customer was off per year) and SAIFI (average number of outages per customer per year). BC's mountainous terrain, exposure to Pacific storms and long rural feeders mean SAIDI is typically several hours per year on average, but much higher in storm seasons. Vancouver Island in particular is exposed to autumn wind events that take down trees onto overhead lines.

Planned outages for maintenance are normally posted 48 to 72 hours in advance by direct notification (letter or postcard) to affected addresses and on the outage map. If you depend on medical equipment, register that under MyHydro so you receive priority notification before planned work.

New connection or service upgrade

For a new build, a service upgrade (e.g. moving from 100 A to 200 A to support an EV charger and a heat pump), a temporary construction service, or any work that requires changes to the physical wires or meter, you deal with BC Hydro. Start at bchydro.com or call 1-800-224-9376.

What you'll need before applying
1
Site address

The civic address and the legal land description (lot, plan, district lot) for rural sites.

2
Site plan

A sketch showing where you want the meter, the service entrance and the run-back to the pole or pad-mounted transformer.

3
Service size

The amperage (100 A, 200 A, 400 A…) and voltage you need, with a load calculation signed off by your electrician.

4
Permits + certification

Municipal building permit and a Technical Safety BC electrical permit, with a sign-off by a licensed electrical contractor once the in-house wiring is done.

Lead time
4 to 16 weeks

Standard urban residential. Rural or remote sites with new poles can take 4 to 9 months.

Fees
BCUC-approved tariff

Service charge + per-metre extension above the contribution threshold.

Once the wires are in and BC Hydro has energised the service, your billing account opens automatically under Rate Schedule 1101. There's no separate retailer to sign up with: BC Hydro handles the connection, the meter and the bill.

Moving home, transferring or closing a service

In BC, the move-in / move-out conversation is a single call (or a single online form) to BC Hydro. There's no second retailer to coordinate with. Most moves can be set up online through MyHydro at bchydro.com with at least 2 business days' notice. Five days is safer for end-of-month moves.

The move-out steps in order
1
Notify BC Hydro

Online through MyHydro or by phone. Give them the move date, the old address and the new one.

2
Confirm dates

2 business days minimum; allow 5 for month-end moves. Same-day disconnections are rare.

3
Final meter read

On the move-out date, BC Hydro records the final reading remotely from the smart meter.

4
Final bill arrives

BC Hydro issues a closing bill for the period up to the move-out date. The new address bill starts separately under MyHydro.

Staying inside BC Hydro's area

Administrative transfer only. No physical work, no service interruption. MyHydro can handle the whole move online; you keep the same account number.

Moving to a different utility

Opening a fresh account is required. If you're moving into FortisBC Electric or a municipal utility area, sign up directly with that utility — BC Hydro can't roll the contract across.

Meters, meter reading and accuracy

BC Hydro completed a province-wide smart meter rollout under the Smart Metering and Infrastructure Program (2011 to 2014). Almost every residential address now has an AMI (Advanced Metering Infrastructure) meter that reports consumption back to BC Hydro automatically, with no need for in-person reads and no estimated bills.

Smart meter (AMI)
Automatic readings

Most residential addresses. Consumption reports back to BC Hydro on its own; you can see hourly use in MyHydro.

Suspect a fault?
Request an accuracy test

BC Hydro pulls the meter and tests it on a calibrated bench against Measurement Canada's tolerance.

Radio-off meter
Manual reading option

A small minority of customers opted out of smart meter radio transmission. A monthly fee applies and a meter reader visits to take the reading manually.

How the accuracy test settles up

If the meter reads outside Measurement Canada's tolerance (typically ±2 %), the test is free and you get a billing adjustment. If it passes, the test fee is charged to you at the BCUC-approved tariff rate.

Contact finder

What do you need to do with BC Hydro?

Pick an action. The tool shows the right phone, the right link, and what to expect. Nothing is sent anywhere.

Note: under AUC Rule 002, Alberta distributors are not required to pay automatic compensation for outages. Damage claims are evaluated case-by-case on negligence.

Compensation and damage claims: the honest version

This is the section where European-style explainers tend to mislead. British Columbia has no automatic, statutory compensation scheme for individual customers affected by a power outage. Unlike the UK's Ofgem Guaranteed Standards (which pay an automatic amount after defined outage durations), BCUC oversight of BC Hydro focuses on reliability reporting (SAIDI, SAIFI) and on rate-design fairness. The penalty for under-performance flows from the regulator into the next rate case, not from the distributor to you.

If your fridge or freezer contents spoiled, an appliance was damaged by a voltage surge, or you incurred a clear loss during an outage, you can file a Customer Damage Claim with BC Hydro. The claim is evaluated on negligence.

Typically accepted
Distributor at fault
  • +Equipment failure (transformer, switch, cable)
  • +Crew error during work on the network
  • +Switching incident causing voltage spike
  • +Unplanned, distributor-caused service interruption
Routinely denied
Outside distributor control
  • ×Severe weather (wind, ice, atmospheric rivers)
  • ×Wildlife contact (squirrels, birds, raccoons on lines)
  • ×Third-party contact (vehicle hits pole, dig-in)
  • ×Planned outages notified in advance
Faster path for most losses

Most BC home insurance policies cover food spoilage and surge damage at a low deductible. If your loss is meaningful, the insurance route is usually faster than a denied utility claim. Keep dated receipts and photos either way. They're the only basis on which a claim can be evaluated.

Regulator and complaint escalation

If you can't resolve something directly with BC Hydro, there's a clear escalation ladder in BC. The lead regulator is the BC Utilities Commission (BCUC). For some disputes you may also want to involve the Office of the BC Ombudsperson (for procedural fairness questions about a Crown corporation) or the Information and Privacy Commissioner (for data and access-to-information issues).

The escalation ladder
1
Talk to BC Hydro customer service

Most issues resolve here. Call 1-800-224-9376 or log into MyHydro.

2
Ask for a Customer Relations review

If the front line can't fix it, request a written decision from BC Hydro's Customer Relations group. This creates the paper trail needed for the next step.

3
File a complaint with BCUC

BCUC accepts customer complaints once you've exhausted BC Hydro's internal process. Free, written submission via the BCUC complaint form.

4
BC Ombudsperson or court

Last resort. The BC Ombudsperson can review procedural fairness. Court is rare for residential disputes but available for large damage claims.

Selectra energy expert answers

Can I choose a different electricity supplier than BC Hydro?

Not for the energy commodity. British Columbia is a regulated, vertically integrated market: BC Hydro is both the wires-and-poles distributor and the retailer for the territory it serves. Unlike Alberta or Ontario, there are no licensed competitive electricity retailers for residential customers. The only way to be served by a different utility is to live inside the service territory of FortisBC, a municipal utility (Penticton, Summerland, Nelson, New Westminster, Grand Forks), or a small private community utility.

I have a power outage. Who do I call?

Always BC Hydro. Call the 24/7 outage line at 1-888-769-3766, text 74633 (POWER) from your account-linked mobile, or report online at bchydro.com/outages. For a downed live wire or any life-threatening situation, dial 911 first and stay back at least 10 metres.

Why is BC Hydro both my distributor and my retailer?

British Columbia kept its electricity market integrated rather than deregulating it the way Alberta did. The Utilities Commission Act assigns each customer a single service provider for their address, which sets the rates approved by the British Columbia Utilities Commission (BCUC). For most of the province, that single provider is BC Hydro: it generates the electricity (mostly from large hydro dams), transmits it across the high-voltage grid, distributes it on the local wires and bills you for all of it on one combined statement.

Does BC Hydro pay compensation if my food spoils during an outage?

Not automatically. British Columbia has no statutory automatic compensation regime for outages, unlike the UK's Ofgem Guaranteed Standards. You can file a damage claim through BC Hydro's Customer Damage Claim process, but claims are evaluated case-by-case on negligence and are routinely denied if the outage was caused by weather, wildlife, third-party contact or planned work. Keep dated receipts and photos. Most home insurance policies cover food spoilage and surge damage at a low excess and are usually a faster route.

How are BC Hydro rates set?

Rates are approved by the BC Utilities Commission (BCUC) after public hearings on BC Hydro's revenue requirements and rate design. Residential customers pay under a two-tier inclining block: a lower per-kWh rate on the first roughly 1,350 kWh used in a two-month billing period, then a higher rate above that threshold. The structure encourages conservation. A daily basic charge applies regardless of consumption. All rate filings are public on the BCUC website.

Who do I call for a new connection or service upgrade?

BC Hydro. The distributor handles the physical wires, the meter and the connection. Apply through BC Hydro Services at https://www.bchydro.com/ or call 1-800-224-9376. You will typically need a permit from your municipality, an electrical permit from Technical Safety BC, a load calculation signed by an electrician, and (for service upgrades) the new panel rating.