What CNPI / FortisOntario actually does (and why ownership matters)
Ontario's electricity market is structured very differently from Alberta's. Canadian Niagara Power Inc. wears two hats at once: it is the distributor that owns the poles, lines, transformers and meters across five separated service territories, AND it is your default supplier under Ontario's Standard Supply Service (SSS) rules. The bill that arrives at your home covers both jobs.
Unlike most Ontario LDCs — which are wholly owned by their host municipality — CNPI is investor-owned. Its ultimate parent is Fortis Inc., a publicly listed company on the Toronto and New York stock exchanges (FTS). Fortis is one of the largest investor-owned utility holding groups in North America, also owning FortisAlberta, FortisBC, and several U.S. distribution utilities. In Ontario the operating brand is FortisOntario; the corporate brand on bill stubs is Canadian Niagara Power.
- Owns the wires, transformers and smart meters
- Restores power after outages (24/7 dispatch)
- Sends the monthly bill at the OEB's RPP rate
- Profits flow to Fortis Inc. shareholders — not to a municipality
- Replaces the commodity portion of the bill only
- Door-to-door sales banned (ECPA 2010)
- Delivery + Global Adjustment + regulatory unchanged
- CNPI still owns the wires and meter
Both CNPI and FortisAlberta are subsidiaries of Fortis Inc., but they operate under completely different regulatory frameworks. FortisAlberta is a wires-only distributor under the AUC; CNPI is a wires-plus-default-supply distributor under the OEB. So the parent name is the same, the bill structure is not.
Where CNPI delivers power
CNPI's footprint is geographically discontinuous. The largest blocks are in the south-Niagara region (Fort Erie and Port Colborne); separated territories cover Gananoque (St. Lawrence River, eastern Ontario), Eganville (Renfrew County) and a portion of Cornwall delta.
- •Town of Fort Erie (Niagara region, south end)
- •City of Port Colborne (Niagara region, Lake Erie shore)
- •Town of Gananoque (eastern Ontario, on the St. Lawrence River)
- •Eganville (Renfrew County) and the Cornwall delta village
- •Niagara Falls, Lincoln, Pelham, West Lincoln → NPEI
- •Welland → Welland Hydro
- •Niagara-on-the-Lake → NOTL Hydro
- •Most of eastern Ontario (Cornwall city itself, rural Renfrew) → Hydro One Networks
Not sure which one applies to your address? Check your most recent electricity bill: the distributor's name (\"Canadian Niagara Power Inc.\" or \"FortisOntario\") and OEB licence number are printed at the top of the first page.
How CNPI's charges appear on your bill
An Ontario electricity bill is broken into a handful of distinct line items, all of which appear on the same CNPI invoice. Unlike Alberta, where the commodity is billed separately by your retailer, in Ontario almost every household sees a single integrated bill where CNPI acts as both the wires company and the OEB-default supplier.
The per-kWh rate set by the OEB twice a year in the Regulated Price Plan. You pick one of three structures: Time-of-Use (peak/mid/off-peak), Tiered (low- and high-block) or Ultra-Low Overnight (for EV owners).
Funds the difference between the market price and the long-term contracts the IESO signed for nuclear, hydro, wind, solar and conservation. RPP customers see this rolled into the commodity rate; bigger customers see it as its own line.
The cost of moving electricity from the IESO-controlled grid through CNPI's wires to your meter. Includes a fixed monthly service charge plus a per-kWh distribution rate set by the OEB — and CNPI files a separate rate schedule for each rate zone.
Small line covering OEB programs, the Wholesale Market Service Rate and a few other system-wide charges. Set by the OEB and applied uniformly across Ontario LDCs.
A provincial credit that reduces the pre-tax subtotal by a percentage set by the government (currently around 13 %). Applied automatically to eligible residential, farm and small-business accounts.
The 13 % federal-provincial sales tax applied to the post-rebate subtotal. Cannot be avoided; appears at the bottom of the bill.
CNPI's delivery rate is set by the OEB under its cost-of-service rate-setting framework, with separate revenue requirements for each rate zone. Rates are filed publicly on the OEB's eFiling portal and can be examined line by line by any customer or consumer advocate. The framework caps year-over-year increases against approved revenue requirements and productivity targets.
A practical implication: if a licensed retailer offers a low fixed per-kWh rate, you'll still pay the same CNPI delivery and regulatory charges, the same Global Adjustment, the same HST. Switching retailers changes the commodity portion of your bill; switching never changes CNPI's portion.
Peak (4-7pm), mid-peak, off-peak. Best for households that can shift heavy use to evenings and weekends.
A low block for the first ~600 kWh per month (residential), a higher block above. Best for steady, modest users.
Very cheap from 11pm to 7am, much more expensive 4-9pm. Best for EV owners or anyone who can charge overnight.
Contact details: 24/7 outage hotline, weekday office
CNPI uses a single toll-free 24/7 emergency hotline across all its territories and separate local lines for billing and account services.
Outages, downed wires, electrical emergencies. For a downed live wire, call 911 first.
Monday to Friday, 8:30 a.m. to 4:30 p.m. (excluding holidays). Alternate line: 905-835-0051.
1130 Bertie Street
P.O. Box 1218
Fort Erie, ON L2A 5Y2
cnpower.com customer portal: e-bills, usage, inquiries
For non-urgent questions you can also use CNPI's online tools: the customer outage map or the FortisOntario portal at https://www.cnpower.com.
Report a power outage
If your power is out, the fastest path is to call 1-844-501-9473 (1-844-WIRE, 24/7 toll-free). Live status is available on the customer outage map, which was launched in December 2024. CNPI also posts event updates on its Facebook page.
Call 1-844-501-9473 (24/7 toll-free). Have your address and account number ready.
The system pinpoints which feeder or substation is affected in your specific CNPI territory. Crews are dispatched from the nearest depot.
Estimated restoration time appears on the customer outage map. Storm events affecting Fort Erie or Port Colborne (lake-effect) can take longer than the smaller territories.
Power is verified at the smart meter. Reset clocks, check freezer contents, and file a damage claim quickly if anything was lost.
Reliability and the OEB scorecard
CNPI reports its reliability performance to the Ontario Energy Board every year in a public scorecard. The headline metrics are SAIDI (average hours a customer was off per year) and SAIFI (average number of interruptions per customer per year). Because CNPI operates across several geographically separated territories, the scorecard reports performance pooled across the whole utility. The annual MD&A is published on the OEB scorecard registry.
Planned outages for maintenance are normally posted at least 48 hours in advance, by direct notice to affected addresses and on the customer outage map. If you depend on medical equipment, contact CNPI to register for priority notification.
New connection or service upgrade
For a new build, a service upgrade (e.g. moving from 100 A to 200 A for an EV charger or heat pump), a temporary construction service, or any work that requires changes to the physical wires or meter, you deal with CNPI. Start at https://www.cnpower.com or call 905-871-0330.
The civic address and the legal description of the lot inside the specific CNPI territory.
A sketch showing where you want the meter, service entrance, and run-back to the pole or underground vault.
The amperage (100 A, 200 A, 400 A…) and voltage you need, signed off by your Master Electrician.
An Electrical Safety Authority permit and ESA sign-off once the in-house wiring is done. CNPI cannot energise until ESA clears it.
For routine residential connections once all conditions are met. Industrial builds or service-relocation work in any of CNPI's separate territories can run weeks or months.
Fixed component + per-metre charge above the contribution threshold defined in CNPI's Conditions of Service for each rate zone.
Once the wires are in, your account opens automatically under Standard Supply Service at the OEB's Regulated Price Plan rate. You can switch your RPP structure (Time-of-Use, Tiered or Ultra-Low Overnight) at any time by contacting CNPI. If you sign with a licensed retailer later, the retailer registers their contract with CNPI and the commodity rate is replaced on your next bill cycle.
Moving home, transferring or closing a service
In CNPI's territories, the move-in / move-out conversation starts with CNPI directly, not with a separate retailer. Because CNPI is the default supplier, it closes the old billing account, sets up the new one, and triggers the final meter read. If you have a licensed retailer contract you also notify the retailer separately. Most move requests need at least 1 to 2 business days of notice; 5 is safer for end-of-month moves.
Call 905-871-0330 (or use the online portal). Give them the move date and your new address.
1 to 2 business days minimum; allow 5 for month-end moves. Same-day service is rare.
On the move-out date, CNPI records the final reading remotely from the smart meter.
CNPI issues a closing bill for the period up to the move-out date. The new address bill starts under a fresh account.
Administrative transfer only when both addresses are inside the same CNPI rate zone (e.g. moving within Fort Erie). Your RPP structure (TOU, Tiered, ULO) carries over by default; ask CNPI if you want to change it at the new address. If you cross into a different CNPI territory, the delivery rate may change.
Opening a fresh account is required at the new LDC. Common destinations from CNPI's Niagara territories include Welland Hydro, NPEI, and NOTL Hydro.
Meters, meter reading and accuracy
CNPI owns the meter at your address. Since the province-wide smart-meter rollout was completed in 2010-2011, virtually every CNPI residential and small-business address is equipped with a smart meter supporting Time-of-Use pricing. The meter is the basis for both the consumption side of your bill and the choice between TOU, Tiered or Ultra-Low Overnight RPP structures.
Every CNPI residential address. Consumption reports back automatically; no action from you, no estimated bills.
CNPI pulls the meter and tests it on a calibrated bench against Measurement Canada's tolerance.
Download your hour-by-hour consumption via the customer portal or pipe it directly into an authorised third-party energy app.
If the meter reads outside Measurement Canada's tolerance (typically ±2 %), the test is free and you get a billing adjustment back to the date the fault is presumed to have started. If the meter passes, the test fee is charged to you at the OEB-approved tariff rate.
What do you need to do with Canadian Niagara Power?
Pick an action. The tool shows the right phone, the right link, and what to expect. Nothing is sent anywhere.
Note: under AUC Rule 002, Alberta distributors are not required to pay automatic compensation for outages. Damage claims are evaluated case-by-case on negligence.
Compensation and damage claims: the honest version
Ontario has no automatic, statutory compensation scheme for individual customers affected by a power outage. Unlike the UK's Ofgem Guaranteed Standards, the OEB's role is to require CNPI to report its reliability performance (SAIDI, SAIFI) every year in its public scorecard. Penalties for under-performance flow from the regulator to the distributor; they do not arrive in your mailbox as a credit.
If your fridge or freezer contents spoiled, an appliance was damaged by a voltage surge, or you incurred a clear loss during an outage, you can file a damage claim with CNPI. The claim is evaluated on negligence.
- +Equipment failure (transformer, network switch)
- +Crew error during work on the network
- +Switching incident causing voltage spike
- +Unplanned, distributor-caused service interruption
- ×Severe weather (lightning, lake-effect winds, ice storms)
- ×Wildlife contact (squirrels, raccoons on lines)
- ×Third-party contact (vehicle hits pole, dig-in)
- ×Loss-of-supply events upstream of CNPI
Most home insurance policies in CNPI's territories cover food spoilage and surge damage at a low excess. If your loss is meaningful, the insurance route is usually faster than a denied utility claim. Keep dated receipts and photos either way. They're the only basis on which any claim can be evaluated.
Regulator and complaint escalation
If you can't resolve something directly with CNPI, there's a clear escalation ladder in Ontario. The Ontario Energy Board sits at the top as both the economic regulator and the body that handles consumer complaints; the Electrical Safety Authority covers physical-safety issues.
Sets the Regulated Price Plan, approves CNPI's distribution tariffs and reviews service-quality reporting (scorecards). Also runs the OEB Consumer Protection Office for individual disputes.
Administers Ontario Regulation 22/04, audits CNPI's distribution-asset safety practices and tracks the Serious Electrical Incident Index. Issues electrical permits for in-house wiring.
Most issues resolve here. Phone 905-871-0330 (Monday to Friday, 8:30 a.m. to 4:30 p.m.) or use the online portal.
If the front line can't fix it, request a written decision in writing. This creates the paper trail needed for the next step.
The OEB investigates complaints involving Ontario LDCs, retailers and unit sub-meter providers. The service is free.
Last resort. For tariff or service-quality issues you can intervene as a registered intervenor in a rate proceeding. For damage claims that are denied, civil court is the final route.