What Coopérative Hydro Embrun actually does (and why your bill says "Coopérative Hydro Embrun" at the top)

Ontario's electricity market is structured very differently from Alberta's, and Coopérative Hydro Embrun is one example of how it works. Coopérative Hydro Embrun wears two hats at once: it is the distributor that owns the poles, overhead lines, transformers and meters across Embrun and Russell Township, AND it is your default supplier under Ontario's Standard Supply Service (SSS) rules. The bill that arrives at your home covers both jobs.

The per-kWh rate Coopérative Hydro Embrun charges most residential and small-business customers is set by the Ontario Energy Board (OEB) twice a year in its Regulated Price Plan (RPP), with three structures to choose from: Time-of-Use, Tiered or Ultra-Low Overnight. Long-term fixed-rate retailer contracts exist, but they are a niche market in Ontario, and signing one does not change the delivery, regulatory or Global Adjustment lines on your bill, only the commodity portion. The wires that bring the electricity to your Embrun address belong to Coopérative Hydro Embrun regardless.

The wires + the default supply
Coopérative Hydro Embrun (both roles)
  • Owns the wires, transformers and smart meters in Embrun
  • Restores power after outages (24/7 dispatch + mutual aid)
  • Sends the monthly bill at the OEB's RPP rate
  • Fixed by address: every property inside the licensed Coopérative Hydro Embrun area
Alternative: licensed retailer
Long-term fixed-rate contract
  • Replaces the commodity portion of the bill only
  • Door-to-door sales banned (ECPA 2010)
  • Delivery + Global Adjustment + regulatory unchanged
  • Coopérative Hydro Embrun still owns the wires and meter
A cooperative quirk worth knowing

CHE is one of the few electricity cooperatives in Ontario. Customers are not just rate-payers but members of the co-op, with voting rights on the board. The rate structure follows the OEB's standard framework like any other LDC, but the governance model is uncommon and worth knowing about if you're moving into Embrun: any annual surplus is returned to members rather than to a municipal shareholder.

Where Coopérative Hydro Embrun delivers power

In plain words: if you live or run a business inside the villages of Embrun and Limoges and the surrounding part of Russell Township in eastern Ontario, between Ottawa and Casselman. Coopérative Hydro Embrun is your distributor. Your specific street address determines coverage. Outside the licensed area you typically end up on Hydro One Networks.

Embrun
Service area
Embrun and Russell Township
~2,750
Customer accounts
Residential + commercial
Town
Network type
Mixed urban + light industry
OEB
Regulator
Cost-of-service framework
Covered by Coopérative Hydro Embrun
  • •Village of Embrun (the township seat in Russell)
  • •Adjacent parts of Russell Township within the licensed CHE area
  • •Residential, commercial and farm addresses inside the co-op's service boundary
NOT covered (use these instead)
  • •City of Ottawa + Casselman → Hydro Ottawa
  • •Town of Hawkesbury → Hydro Hawkesbury
  • •Alfred & Plantagenet → Hydro 2000
  • •Rural roads outside the co-op area → Hydro One Networks
Communities inside Coopérative Hydro Embrun's territory
Embrun Russell Township

Not sure which one applies to your address? Check your most recent electricity bill: the distributor's name and OEB licence number are printed at the top of the first page.

How Coopérative Hydro Embrun's charges appear on your bill

An Ontario electricity bill is broken into a handful of distinct line items, all of which appear on the same Coopérative Hydro Embrun invoice. Unlike Alberta, where the commodity is billed separately by your retailer, in Ontario almost every household sees a single integrated bill where Coopérative Hydro Embrun acts as both the wires company and the OEB-default supplier.

Electricity (commodity)

The per-kWh rate set by the OEB twice a year in the Regulated Price Plan. You pick one of three structures: Time-of-Use (peak/mid/off-peak), Tiered (low- and high-block) or Ultra-Low Overnight (for EV owners).

Global Adjustment

Funds the difference between the market price and the long-term contracts the IESO signed for nuclear, hydro, wind, solar and conservation. RPP customers see this rolled into the commodity rate; bigger customers see it as its own line.

Delivery

The cost of moving electricity from the IESO-controlled grid through Coopérative Hydro Embrun's wires to your meter. Includes a fixed monthly service charge plus a per-kWh distribution rate set by the OEB.

Regulatory charges

Small line covering OEB programs, the Wholesale Market Service Rate and a few other system-wide charges. Set by the OEB and applied uniformly across Ontario LDCs.

Ontario Electricity Rebate (OER)

A provincial credit that reduces the pre-tax subtotal by a percentage set by the government (currently around 13 %). Applied automatically to eligible residential, farm and small-business accounts.

HST

The 13 % federal-provincial sales tax applied to the post-rebate subtotal. Cannot be avoided; appears at the bottom of the bill.

Coopérative Hydro Embrun's delivery rate is set by the OEB under the standard Cost-of-Service / Price Cap Incentive framework used by small LDCs. Rates are filed publicly on the OEB's eFiling portal and can be examined line by line by any customer or consumer advocate. The framework caps year-over-year increases against inflation and productivity targets.

A practical implication: if a licensed retailer offers a low fixed per-kWh rate, you'll still pay the same Coopérative Hydro Embrun delivery and regulatory charges, the same Global Adjustment, the same HST. Switching retailers changes the commodity portion of your bill; switching never changes Coopérative Hydro Embrun's portion.

Time-of-Use (TOU)

Peak (4-7pm), mid-peak, off-peak. Best for households that can shift heavy use to evenings and weekends.

Tiered

A low block for the first ~600 kWh per month (residential), a higher block above. Best for steady, modest users.

Ultra-Low Overnight (ULO)

Very cheap from 11pm to 7am, much more expensive 4-9pm. Best for EV owners or anyone who can charge overnight.

Contact details: outage line vs general customer service

Coopérative Hydro Embrun provides a single main number for billing, moves, account changes, new connections and outage reports. The line splits internally between business-hours customer service and the after-hours on-call outage technician.

Mailing & HQ address

821 Notre-Dame Street, Suite 200
Embrun, ON K0A 1W1

Bilingual service

English & French (Prescott-Russell)

Online portal

Account access & non-urgent forms

For non-urgent questions you can use Coopérative Hydro Embrun's website at https://hydroembrun.ca or the dedicated outages page for planned-work notices.

Report a power outage

If your power is out in Embrun, call 613-443-5110 first. Coopérative Hydro Embrun does not publish a live outage map, so the phone call is also how you find out whether the outage is system-wide or limited to your transformer. Planned-outage notices for scheduled maintenance are posted on the outages page.

How it works: from your call to power back on
1
You report it

Call 613-443-5110 (or the backup ). Have your address and account number ready.

2
On-call team

Coopérative Hydro Embrun's field crew (or its operator, where applicable) is dispatched. Mutual-aid agreements with neighbouring LDCs cover bigger storm events.

3
Crew restores

Single faults are typically restored in an hour or two. Storm-wide outages affecting most of the network can take longer.

4
Service back

Power is verified at the meter. Reset clocks, check freezer contents, and report any damage right away by phone.

Reliability and the OEB scorecard

Coopérative Hydro Embrun reports its reliability performance to the OEB every year in its public scorecard. The headline metrics are SAIDI (average hours a customer was off per year) and SAIFI (average number of interruptions per customer per year), each measured against the OEB's distributor-specific performance standard. Because the network footprint is relatively small, a single substation issue or a major storm can move Coopérative Hydro Embrun's annual numbers more than they would move a large urban LDC's.

Planned outages for maintenance are normally posted at least 48 hours in advance. If you depend on medical equipment, register with Coopérative Hydro Embrun so you receive priority notification.

New connection or service upgrade

For a new build, a service upgrade (e.g. moving from 100 A to 200 A for an EV charger or heat pump), a temporary construction service, or any work that requires changes to the physical wires or meter, you deal with Coopérative Hydro Embrun. Call 613-443-5110 during business hours or visit https://hydroembrun.ca. The OEB sets a 5-business-day standard for routine residential connections once all customer-side conditions are met.

What you'll need before applying
1
Site address

The civic address and the legal description of the lot inside the licensed Coopérative Hydro Embrun service area.

2
Site plan

A sketch showing where you want the meter, service entrance, and run-back to the pole.

3
Service size

The amperage (100 A, 200 A, 400 A…) and voltage you need, signed off by your Master Electrician.

4
ESA permit + certification

An Electrical Safety Authority permit and ESA sign-off once the in-house wiring is done. Coopérative Hydro Embrun cannot energise until ESA clears it.

Lead time
5 business days (standard)

For routine residential connections once all conditions are met. New service drops or service upgrades involving pole work can run longer.

Fees
OEB-approved tariff

Fixed component + per-metre charge above the contribution threshold defined in Coopérative Hydro Embrun's Conditions of Service.

Once the wires are in, your account opens automatically under Standard Supply Service at the OEB's Regulated Price Plan rate. You can switch your RPP structure (Time-of-Use, Tiered or Ultra-Low Overnight) at any time by contacting Coopérative Hydro Embrun. If you sign with a licensed retailer later, the retailer registers their contract with Coopérative Hydro Embrun and the commodity rate is replaced on your next bill cycle.

Moving home, transferring or closing a service

In Embrun, the move-in / move-out conversation starts with Coopérative Hydro Embrun directly, not with a separate retailer. Because Coopérative Hydro Embrun is the default supplier, it closes the old billing account, sets up the new one, and triggers the final meter read. If you have a licensed retailer contract you also notify the retailer separately so they can transfer or cancel their commodity supply. Most move requests need at least 1 to 2 business days of notice; 5 is safer for end-of-month moves.

The move-out steps in order
1
Call Coopérative Hydro Embrun

Call 613-443-5110. Give them the move date and your new address.

2
Confirm dates

1 to 2 business days minimum; allow 5 for month-end moves. Same-day service is rare.

3
Final meter read

On the move-out date, Coopérative Hydro Embrun records the final reading remotely from the smart meter; no in-person visit required.

4
Final bill arrives

Coopérative Hydro Embrun issues a closing bill for the period up to the move-out date. The new address bill starts under a fresh account.

Staying inside Coopérative Hydro Embrun

Administrative transfer only. No physical work, no service interruption. Your RPP structure (TOU, Tiered, ULO) carries over by default; ask Coopérative Hydro Embrun if you want to change it at the new address.

Moving to a different distributor

Opening a fresh account is required at the new LDC. Common destinations from Embrun include Hydro Ottawa, Hydro Hawkesbury, Hydro 2000, or Hydro One Networks for rural Prescott-Russell.

Meters, meter reading and accuracy

Coopérative Hydro Embrun owns the meter at your address. Since the province-wide smart-meter rollout was completed in 2010-2011, virtually every residential and small-business address in Coopérative Hydro Embrun's territory is equipped with a smart meter that supports the OEB's Time-of-Use pricing structure. The meter is the basis for both the consumption side of your bill and the choice between TOU, Tiered or Ultra-Low Overnight RPP structures.

Smart meter (AMI)
Automatic readings

Every residential address in the licensed area. Consumption reports back to Coopérative Hydro Embrun on its own; no action from you, no estimated bills.

Suspect a fault?
Request an accuracy test

Coopérative Hydro Embrun pulls the meter and tests it on a calibrated bench against Measurement Canada's tolerance.

Green Button
Your own hourly data

Where supported, you can download your hour-by-hour consumption and pipe it into an authorised third-party energy app.

How the accuracy test settles up

If the meter reads outside Measurement Canada's tolerance (typically ±2 %), the test is free and you get a billing adjustment back to the date the fault is presumed to have started. If the meter passes, the test fee is charged to you at the OEB-approved tariff rate.

Contact finder

What do you need to do with Coopérative Hydro Embrun?

Pick an action. The tool shows the right phone, the right link, and what to expect. Nothing is sent anywhere.

Note: under AUC Rule 002, Alberta distributors are not required to pay automatic compensation for outages. Damage claims are evaluated case-by-case on negligence.

Compensation and damage claims: the honest version

Ontario has no automatic, statutory compensation scheme for individual customers affected by a power outage. Unlike the UK's Ofgem Guaranteed Standards, the OEB's role is to require Coopérative Hydro Embrun to report its reliability performance (SAIDI, SAIFI) every year in its public scorecard. Penalties for under-performance flow from the regulator to the distributor; they do not arrive in your mailbox as a credit.

If your fridge or freezer contents spoiled, an appliance was damaged by a voltage surge, or you incurred a clear loss during an outage, you can file a damage claim with Coopérative Hydro Embrun. The claim is evaluated on negligence.

Typically accepted
Distributor at fault
  • +Equipment failure (transformer, network switch)
  • +Crew error during work on the network
  • +Switching incident causing voltage spike
  • +Unplanned, distributor-caused service interruption
Routinely denied
Outside distributor control
  • ×Severe weather (lightning, wind, ice storms)
  • ×Wildlife contact (squirrels, raccoons on lines)
  • ×Third-party contact (vehicle hits pole, dig-in)
  • ×Planned outages notified in advance
Faster path for most losses

Most Ontario home insurance policies cover food spoilage and surge damage at a low excess. If your loss is meaningful, the insurance route is usually faster than a denied utility claim. Keep dated receipts and photos either way. They're the only basis on which any claim can be evaluated.

Regulator and complaint escalation

If you can't resolve something directly with Coopérative Hydro Embrun, there's a clear escalation ladder in Ontario. The Ontario Energy Board sits at the top as both the economic regulator and the body that handles consumer complaints; the Electrical Safety Authority covers physical-safety issues.

The escalation ladder
1
Talk to Coopérative Hydro Embrun customer service

Most issues resolve here. Phone 613-443-5110 during business hours; ask for the customer service supervisor if needed.

2
Ask for a formal written response

If the front line can't fix it, request a written decision. This creates the paper trail needed for the next step.

3
File a complaint with the OEB Consumer Protection Office

The OEB investigates complaints involving Ontario LDCs, retailers and unit sub-meter providers. The service is free.

4
OEB formal hearing or court action

Last resort. For tariff or service-quality issues you can intervene as a registered intervenor. For denied damage claims, civil court is the final route.

Selectra energy expert answers

I'm in Embrun and the power is out. Who do I call?

Coopérative Hydro Embrun directly. Call 613-443-5110. CHE is a small cooperative without a published live outage map, so the phone is the primary channel. If you see a downed live wire or smell smoke, call 911 first.

Is Coopérative Hydro Embrun the company that bills me for my electricity?

Yes. In its service area around Embrun, CHE is both the wires company and the default supplier under Ontario's Standard Supply Service. The per-kWh rate it charges you is the Ontario Energy Board's Regulated Price Plan (RPP), updated every six months. The fact that CHE is a member-owned co-op rather than a municipal corporation doesn't change the billing model; the OEB rules are the same.

What does "member-owned cooperative" mean for my bill?

The rate-setting is identical to any other Ontario LDC: the OEB approves CHE's distribution tariff and you pay the RPP commodity rate plus delivery, regulatory, Global Adjustment, OER and HST. The difference is governance: CHE is owned by its members, not by a municipality, and annual surpluses go back to the co-op rather than to a municipal shareholder. The CHE board is elected by members, and the annual report is voted on at the AGM.

Can I choose a different distributor in Embrun?

No. Your distributor is determined by your address. Every home and business inside CHE's licensed service area is served by CHE, and you cannot switch wires companies. You can choose your retailer (the commodity contract) but not the LDC. Rural addresses just outside the cooperative's area typically fall under Hydro One.

Does CHE pay compensation if my food spoils during an outage?

Not automatically. Ontario has no statutory automatic compensation scheme for outages. The OEB requires every LDC, even a small co-op, to report its reliability performance (SAIDI, SAIFI) in its annual scorecard, but financial consequences flow from the regulator to the distributor, not to you. You can file a damage claim with CHE; claims are evaluated on negligence and routinely denied if the cause was weather, wildlife or a third-party contact. Keep dated receipts and photos either way.

Who do I call for a new connection or a 200 A service upgrade?

CHE. The distributor owns the wires and meter, so any new build, service upgrade (e.g. 100 A to 200 A for an EV charger or heat pump), temporary construction service or panel upgrade goes through them. Call 613-443-5110 during business hours. Your licensed electrician will need to pull an ESA permit and get sign-off before CHE can energise the new service.

Is this the same as Hydro Ottawa or Hydro One?

No. Embrun used to be part of the patchwork of small cooperatives and municipal commissions that pre-date the 2000 Ontario electricity reform. When most municipalities merged their commissions into commercial corporations, CHE kept its cooperative structure. You can confirm which LDC serves your specific address by checking the name printed at the top of your last electricity bill.