What InnPower actually does (and why your bill says "InnPower" at the top)

Ontario's electricity market is structured differently from Alberta's. InnPower wears two hats at once: it is the distributor that owns the poles, lines, transformers and meters across Innisfil and a south-Barrie service pocket, AND it is your default supplier under Ontario's Standard Supply Service (SSS) rules. The bill that arrives at your home covers both jobs.

The per-kWh rate InnPower charges most residential and small-business customers is set by the Ontario Energy Board (OEB) twice a year in its Regulated Price Plan (RPP), with three structures to choose from: Time-of-Use, Tiered or Ultra-Low Overnight. Long-term fixed-rate retailer contracts exist, but signing one does not change the delivery, regulatory or Global Adjustment lines on your bill — only the commodity portion.

The wires + the default supply
InnPower (both roles)
  • Owns the wires, transformers, smart meters
  • Restores power after outages (24/7 dispatch)
  • Sends the monthly bill at the OEB's RPP rate
  • Fixed by address: every property inside the service area is served by InnPower
Alternative: licensed retailer
Long-term fixed-rate contract
  • Replaces the commodity portion of the bill only
  • Door-to-door sales banned (ECPA 2010)
  • Delivery + Global Adjustment + regulatory unchanged
  • InnPower still owns the wires and meter
A high-growth GTA commuter context worth knowing

InnPower's customer count has climbed steeply over the past decade as Innisfil and southern Barrie have absorbed GTA commuter growth. The territory mixes older lakeside cottage subdivisions along Lake Simcoe with brand-new residential developments inland (Alcona, Lefroy, the Sleeping Lion / South Barrie pocket). Capacity upgrades and new substations are an ongoing priority in InnPower's OEB rate filings.

Where InnPower delivers power

In plain words: if you live or run a business inside the Town of Innisfil or the south-Barrie service pocket served by InnPower, InnPower is your distributor. There is no overlap and no choice. The rest of the City of Barrie north of the InnPower boundary is served by Alectra Utilities; surrounding rural Simcoe County is served by Hydro One Networks.

Innisfil
Service area
Town of Innisfil + south Barrie pocket
~23,500
Customer accounts
Residential + business combined
High growth
Network type
Suburban + lakeside subdivisions
OEB
Regulator
Cost-of-service rate filings
Covered by InnPower
  • •Alcona, Stroud, Lefroy, Cookstown, Churchill (Town of Innisfil)
  • •South Barrie service pocket (Yonge Street / Mapleview Drive corridor)
  • •Lake Simcoe lakeside subdivisions inside the Innisfil boundary
  • •Every residential, commercial and industrial address inside the licensed service area
NOT covered (use these instead)
  • •Most of the City of Barrie → Alectra Utilities
  • •Wasaga Beach → Wasaga Distribution
  • •Muskoka cottage country (Bracebridge, Huntsville, Parry Sound) → Lakeland Power
  • •Rural Simcoe County (Bradford, New Tecumseth, Springwater outside any LDC town) → Hydro One Networks
Communities inside InnPower's territory
Alcona Stroud Lefroy Cookstown Churchill South Barrie pocket

Not sure which distributor applies to your address? Check your most recent electricity bill: the distributor's name and OEB licence number are printed at the top of the first page.

How InnPower's charges appear on your bill

An Ontario electricity bill is broken into a handful of distinct line items, all of which appear on the same InnPower invoice. Unlike Alberta, where the commodity is billed separately by your retailer, in Ontario almost every household sees a single integrated bill where the LDC acts as both the wires company and the OEB-default supplier.

Electricity (commodity)

The per-kWh rate set by the OEB twice a year in the Regulated Price Plan. You pick one of three structures: Time-of-Use (peak/mid/off-peak), Tiered (low- and high-block) or Ultra-Low Overnight (for EV owners).

Global Adjustment

Funds the difference between the market price and the long-term contracts the IESO signed for nuclear, hydro, wind, solar and conservation. RPP customers see this rolled into the commodity rate; bigger customers see it as its own line.

Delivery

The cost of moving electricity from the IESO-controlled grid through InnPower's wires to your meter. Includes a fixed monthly service charge plus a per-kWh distribution rate set by the OEB.

Regulatory charges

Small line covering OEB programs, the Wholesale Market Service Rate and a few other system-wide charges. Set by the OEB and applied uniformly across Ontario LDCs.

Ontario Electricity Rebate (OER)

A provincial credit that reduces the pre-tax subtotal by a percentage set by the government (currently around 13 %). Applied automatically to eligible residential, farm and small-business accounts.

HST

The 13 % federal-provincial sales tax applied to the post-rebate subtotal. Cannot be avoided; appears at the bottom of the bill.

InnPower's delivery rate is set by the OEB under standard cost-of-service rate filings. Rates are public on the OEB's eFiling portal and can be examined line by line by any customer or consumer advocate. The framework caps year-over-year increases against inflation and productivity targets.

A practical implication: if a licensed retailer offers a low fixed per-kWh rate, you'll still pay the same InnPower delivery and regulatory charges, the same Global Adjustment, the same HST. Switching retailers changes the commodity portion of your bill; switching never changes InnPower's portion.

Time-of-Use (TOU)

Peak (4-7 pm), mid-peak, off-peak. Best for households that can shift heavy use to evenings and weekends.

Tiered

A low block for the first ~600 kWh per month (residential), a higher block above. Best for steady, modest users.

Ultra-Low Overnight (ULO)

Very cheap from 11 pm to 7 am, much more expensive 4-9 pm. Best for EV owners or anyone who can charge overnight.

Contact details: one number, two purposes

InnPower consolidates customer contact through a single phone line. Outage and emergency dispatch are 24/7; billing, moves, account changes and new connections are handled during business hours.

Mailing & HQ address

7251 Yonge Street, Innisfil, ON L9S 0J3

Outage map

Live restoration ETAs published on the public outage map

Website

My Account portal, online forms and outage alerts

For non-urgent questions you can also use InnPower's online tools: the live outage map and the My Account portal at https://innpower.ca.

Report a power outage

If your power is out, the fastest path is to call 1-855-300-2990, monitored 24/7, or report it via the outage portal. Live restoration estimates are published on the outage map.

How it works: from your call to power back on
1
You report it

Call 1-855-300-2990 or use the outage portal. Have your address and account number ready.

2
Dispatch confirms

The system pinpoints the affected feeder or transformer and assigns a crew or pole patrol.

3
Crew restores

Estimated restoration time appears on the live map. Urban North Bay faults are usually minutes to under an hour; rural feeders in Espanola and Sables-Spanish Rivers can take longer.

4
Service back

Power is verified at the smart meter. Reset clocks, check freezer contents, and report any damage right away via the claims process.

Reliability and the OEB scorecard

InnPower reports its reliability performance to the OEB every year in its public scorecard. The headline metrics are SAIDI (average hours a customer was off per year) and SAIFI (average number of interruptions per customer per year). The latest scorecard is published on InnPower's website and on the OEB's distributor performance portal. Long rural feeders through forested terrain tend to push the SAIDI and SAIFI numbers higher than dense urban-only LDCs like Toronto Hydro.

Planned outages for maintenance are normally posted at least 48 hours in advance, by notice to affected addresses and on the website. If you depend on medical equipment, register with InnPower's medical-needs program so you receive priority notification.

New connection or service upgrade

For a new build, a service upgrade (e.g. moving from 100 A to 200 A for an EV charger or heat pump), a temporary construction service, or any work that requires changes to the physical wires or meter, you deal with InnPower. Start at https://innpower.ca or call 705-431-4321. The OEB standard for routine connections is 5 business days once all conditions are met.

What you'll need before applying
1
Site address

The civic address and the legal description of the lot inside the service area.

2
Site plan

A sketch showing where you want the meter, service entrance, and run-back to the pole or pad-mount transformer.

3
Service size

The amperage (100 A, 200 A, 400 A…) and voltage you need, signed off by your Master Electrician.

4
ESA permit + certification

An Electrical Safety Authority permit and ESA sign-off once the in-house wiring is done. InnPower cannot energise until ESA clears it.

Lead time
5 business days (standard)

For routine residential connections once all conditions are met. Complex builds or rural extensions can run several months.

Fees
OEB-approved tariff

Fixed component + per-metre charge above the contribution threshold defined in InnPower's Conditions of Service.

Once the wires are in, your account opens automatically under Standard Supply Service at the OEB's Regulated Price Plan rate. You can switch your RPP structure (Time-of-Use, Tiered or Ultra-Low Overnight) at any time by contacting InnPower.

Moving home, transferring or closing a service

In the InnPower service area, the move-in / move-out conversation starts with InnPower directly, not with a separate retailer. Because the LDC is the default supplier, it closes the old billing account, sets up the new one, and triggers the final meter read. Most move requests need at least 1 to 2 business days of notice; 5 is safer for end-of-month moves.

The move-out steps in order
1
Call InnPower

Call 705-431-4321 (or use My Account online). Give them the move date and your new address.

2
Confirm dates

1 to 2 business days minimum; allow 5 for month-end moves. Same-day service is rare.

3
Final meter read

On the move-out date, InnPower records the final reading remotely from the smart meter; no in-person visit required.

4
Final bill arrives

InnPower issues a closing bill for the period up to the move-out date. The new address bill starts under a fresh account.

Staying inside InnPower

Administrative transfer only. No physical work, no service interruption. Your RPP structure (TOU, Tiered, ULO) carries over by default; ask InnPower if you want to change it.

Moving to a different distributor

Opening a fresh account is required at the new LDC. Common destinations from Innisfil include Alectra Utilities for most of Barrie, Wasaga Distribution for Wasaga Beach, and Hydro One Networks for the rest of rural Simcoe County.

Meters, meter reading and accuracy

InnPower owns the meter at your address. Since the province-wide smart-meter rollout was completed in 2010-2011, virtually every residential and small-business address in the service area is equipped with a smart meter that supports the OEB's Time-of-Use pricing structure.

Smart meter (AMI)
Automatic readings

Every residential address. Consumption reports back to InnPower on its own; no action from you, no estimated bills.

Suspect a fault?
Request an accuracy test

InnPower pulls the meter and tests it on a calibrated bench against Measurement Canada's tolerance.

Green Button
Your own hourly data

Download your hour-by-hour consumption via My Account or pipe it directly into an authorised third-party energy app.

How the accuracy test settles up

If the meter reads outside Measurement Canada's tolerance (typically ±2 %), the test is free and you get a billing adjustment back to the date the fault is presumed to have started. If the meter passes, the test fee is charged to you at the OEB-approved tariff rate.

Contact finder

What do you need to do with InnPower?

Pick an action. The tool shows the right phone, the right link, and what to expect. Nothing is sent anywhere.

Note: under AUC Rule 002, Alberta distributors are not required to pay automatic compensation for outages. Damage claims are evaluated case-by-case on negligence.

Compensation and damage claims: the honest version

Ontario has no automatic, statutory compensation scheme for individual customers affected by a power outage. Unlike the UK's Ofgem Guaranteed Standards, the OEB's role is to require InnPower to report its reliability performance (SAIDI, SAIFI) every year in its public scorecard. Penalties for under-performance flow from the regulator to the distributor; they do not arrive in your mailbox as a credit.

If your fridge or freezer contents spoiled, an appliance was damaged by a voltage surge, or you incurred a clear loss during an outage, you can file a damage claim with InnPower. The claim is evaluated on negligence.

Typically accepted
Distributor at fault
  • +Equipment failure (transformer, switch)
  • +Crew error during work on the network
  • +Switching incident causing voltage spike
  • +Unplanned, distributor-caused service interruption
Routinely denied
Outside distributor control
  • ×Severe weather (lightning, wind, ice storms)
  • ×Wildlife contact (squirrels, raccoons on lines)
  • ×Third-party contact (vehicle hits pole, dig-in)
  • ×Planned outages notified in advance
Faster path for most losses

Most home insurance policies in Ontario cover food spoilage and surge damage at a low excess. If your loss is meaningful, the insurance route is usually faster than a denied utility claim. Keep dated receipts and photos either way.

Regulator and complaint escalation

If you can't resolve something directly with InnPower, there's a clear escalation ladder in Ontario. The Ontario Energy Board sits at the top as both the economic regulator and the body that handles consumer complaints; the Electrical Safety Authority covers physical-safety issues.

The escalation ladder
1
Talk to InnPower customer service

Most issues resolve here. Phone 705-431-4321 (Monday to Friday, 8:30 a.m. to 4:30 p.m.) or use the My Account portal.

2
Ask for a formal written response

If the front line can't fix it, request a written decision. This creates the paper trail needed for the next step.

3
File a complaint with the OEB Consumer Protection Office

The OEB investigates complaints involving Ontario LDCs, retailers and unit sub-meter providers. The service is free.

4
OEB formal hearing or court action

Last resort. For tariff or service-quality issues you can intervene as a registered intervenor in a rate proceeding. For denied damage claims, civil court is the final route.

Selectra energy expert answers

Is InnPower the same company that bills me for my electricity?

Yes, for most Innisfil and south-Barrie InnPower households. InnPower is both the wires company (poles, transformers, smart meters across the Town of Innisfil and the south-Barrie service pocket) and the default supplier under Ontario's Standard Supply Service. The per-kWh rate it charges is the Ontario Energy Board's Regulated Price Plan (RPP), updated every six months. You only see a different supplier name on your bill if you have separately signed with a licensed energy retailer.

I have a power outage. Who do I call?

InnPower directly on the dedicated 24/7 line 1-855-300-2990, or the always-monitored main number 705-431-4321. You can text outage reports to 705-300-3990 or track restoration on the live outage map. If you see a downed live wire or smell smoke, call 911 first.

How do I know if my Barrie address is on InnPower or Alectra Utilities?

Check your most recent electricity bill: the LDC name and OEB licence number are printed at the top of the first page. As a rule of thumb, addresses along the south Barrie corridor that historically belonged to Innisfil before annexation remain on InnPower; the rest of Barrie is on Alectra Utilities. The boundary is fixed by address, not by municipal limits.

Does InnPower pay compensation if my food spoils during an outage?

Not automatically. Ontario has no statutory automatic compensation scheme for outages. The OEB requires InnPower to report its reliability performance (SAIDI, SAIFI) in its annual scorecard, but financial consequences flow to the utility, not to you. You can file a damage claim, but claims are evaluated case-by-case on negligence and are routinely denied if the outage was caused by weather, wildlife, third-party contact or planned work. Keep receipts and timestamps regardless.

Can I choose a different electricity distributor in Innisfil?

No. Your distributor is determined by your address. You can choose your retailer (the energy contract) but not your wires company.

Who do I call for a new connection or service upgrade?

InnPower. The distributor owns the physical wires and meter, so any new build, service upgrade (e.g. 100 A to 200 A), temporary construction service or EV-charger panel upgrade goes through them. Call 705-431-4321 or apply online at https://innpower.ca. Your electrician will also need to pull an ESA permit for the in-house wiring.

Why is the bill structured the way it is in Ontario?

Unlike Alberta, where the commodity is billed separately by your retailer, Ontario bills are integrated. The InnPower invoice combines the OEB-set Electricity rate, the Global Adjustment, Delivery, Regulatory charges, the Ontario Electricity Rebate (around 13 %) and HST. Switching to a retailer only replaces the commodity portion. The wires charges stay the same.