What the Reseau electrique d'Amos actually does

The Service d'electricite de la Ville d'Amos is one of nine surviving municipal electricity distributors in Quebec. Like Hydro-Quebec, it is a single integrated utility: it owns the local hydro plant, the wires and poles inside Amos, the meter on your house and the customer contract. One department, one bill, one rate schedule approved by the Regie de l'energie du Quebec. There is no separate retailer to choose, no competitive market, no commodity contract to negotiate.

Historically, Amos developed its small Centrale Hydroelectrique on the Harricana River in the first half of the 20th century to electrify a frontier town that the rest of Quebec's grid did not yet reach. When the provincial government nationalised the bulk of Quebec's private and municipal electric companies into Hydro-Quebec in 1944 and again in 1963, Amos was one of the handful that kept their network in-house. Rates today are among the lowest in North America (roughly 7 to 12 ¢/kWh on the standard residential schedule) because the entire Quebec grid is about 95 % hydroelectric.

Amos's utility does everything
Generation + grid + retail
  • Generates part of its own electricity at the Harricana River hydro station
  • Buys top-up wholesale power from Hydro-Quebec at Tarif L
  • Owns the local wires, poles, transformers and meters
  • Bills you for the energy and delivery on one combined municipal statement
You don't choose a retailer
No competitive market in Quebec
  • ×No "switch retailer" decision to make for electricity
  • ×No RRO, no commodity contracts, no fixed vs variable plans
  • ×Rates are set by the Regie de l'energie after a public file
  • ×The only way to a different utility is to live outside Amos city limits

Where the Reseau electrique d'Amos delivers power

In plain words: if your address is inside the city limits of Amos, in the Abitibi-Temiscamingue region, your distributor is the municipal Service d'electricite. Everything outside Amos — the surrounding parishes, neighbouring towns like Val-d'Or and Rouyn-Noranda, and the rural Abitibi territory — is served by Hydro-Quebec.

~6,000
Customer accounts
Homes, business, municipal
~13,000
Population in town
Regional capital of Abitibi
~600 km
North-west of Montreal
Far-north Abitibi-Temiscamingue
1
Hydro station
Centrale on the Harricana River
Covered by Amos's utility
  • •City core: downtown Amos, the residential streets along 1re Avenue Ouest and 6e Rue Ouest
  • •Industrial park: the local light-industry zone served at low and medium voltage
  • •Municipal buildings: the city hall, the arena, the local schools and the hospital connection
  • •About 6,000 residential and commercial accounts inside Amos city limits
NOT covered (use Hydro-Quebec)
  • •Adjacent parishes (Saint-Mathieu-d'Harricana, Saint-Marc-de-Figuery, Trecesson) → Hydro-Quebec
  • •Val-d'Or, Rouyn-Noranda, La Sarre and the rest of Abitibi-Temiscamingue → Hydro-Quebec
  • •Rural cottage zones on the lakes around Amos → Hydro-Quebec
  • •Crown-land industrial users in the surrounding forestry sector → Hydro-Quebec direct service

Not in Amos's territory? Pick your distributor

Not sure which one? Check the top of your most recent electricity bill: the name of the utility is printed alongside your account number. A municipal bill from the Ville d'Amos means you are served by the Service d'electricite; an Hydro-Quebec bill means you are outside city limits.

How residential rates work in Amos

Because the Service d'electricite is integrated (its own hydro station plus bulk supply from Hydro-Quebec, with local wires and billing under one roof), your monthly bill is simpler than what an Alberta customer sees. There is no separate "delivery" half to compare against a commodity rate. The Regie-approved residential schedule combines everything into a single per-kWh price that depends on consumption, plus a small fixed daily charge. In practice the schedule tracks Hydro-Quebec's Tarif D closely, because Amos buys most of its energy from Hydro-Quebec at the wholesale Tarif L.

Daily fixed charge

A small fixed amount per day (around 41 ¢ on the Hydro-Quebec benchmark), regardless of consumption. Covers metering, billing and customer support. Adds up to roughly $12 over a monthly billing cycle.

First-block energy charge

Applies to the first 40 kWh per day of consumption on the benchmark Tarif D (roughly the average household's baseline usage in summer). A low per-kWh rate, indexed by the Regie.

Second-block energy charge

A higher per-kWh rate on every kWh above the first-block threshold (very common in winter for electrically-heated homes). The two-block design encourages conservation.

Annual indexation

The Regie sets a single province-wide indexation cap for residential rates every year. Small utilities like Amos either match Hydro-Quebec's rates or file a small variance with justification.

Municipal fee line

In Amos the electricity statement is issued by the city itself, so you may see the energy charges alongside other municipal line items. They are accounted for separately under the Regie schedule.

GST & QST

Federal GST (5 %) and Quebec's QST (9.975 %) are applied to electricity in Quebec. They show on the bottom of the statement, after the energy and fixed charges.

The two-block residential rate has been the Quebec standard for decades. The threshold is set at roughly the consumption of a small all-electric home in summer, so households with electric space heating in a poorly-insulated dwelling will spend much of the heating season in the second block. Heat pumps, electric vehicles and large electric water heaters are the most common reasons a household tips heavily into the second block month after month.

The Regie de l'energie publishes every approved rate change on its public registry. Its decisions on Hydro-Quebec set the benchmark that small utilities like Amos either follow or deviate from with documented reasons. The current rate schedule is available on the Service d'electricite page on the Ville d'Amos website.

Contact details: emergency line first

For non-urgent questions you can also use the city's online channels: the Service d'electricite page on the Ville d'Amos website explains how to apply for a new connection or update your billing information. In-person enquiries go through the city hall on rue Principale Sud during regular weekday business hours.

Report a power outage

If your power is out, the fastest path is to call 819-732-3254. Because the network is small and the field crew is local, the city is normally aware of any outage that affects more than a single address within a few minutes. There is no public outage map on a network this size: dispatch tracks the affected feeder directly and assigns a crew if the cause is not already identified.

How it works: from your call to power back on
1
You report it

Call 819-732-3254. Have your address ready. After-hours the line forwards to the on-call duty technician.

2
Dispatch confirms

The duty technician identifies which feeder or transformer is affected. On a network this small, that step is often immediate.

3
Crew restores

Local-fault restoration is typically minutes to a couple of hours. Storm-wide events in the Abitibi forest belt can take longer.

4
Service back

Power is verified at the meter. Reset clocks, check the freezer, and report any damage right away to the Service d'electricite.

A small municipal network like Amos's typically achieves very good reliability inside city limits: short feeders, urban tree management, and a single dispatch point keep the average customer outage time low compared with rural Hydro-Quebec feeders. The trade-off is exposure to single-point faults — when the main substation or the bulk supply line from Hydro-Quebec is interrupted, the whole town can go off at once.

Planned outages for maintenance are normally announced 48 to 72 hours in advance through direct notification to affected addresses and on the Ville d'Amos website. If you depend on medical equipment, let the Service d'electricite know so you can be added to the priority-notification list before planned work.

New connection or service upgrade

For a new build, a service upgrade (e.g. moving from 100 A to 200 A to support an EV charger and a heat pump), a temporary construction service, or any work that requires changes to the physical wires or meter, you deal with the Service d'electricite de la Ville d'Amos. Start at ville.amos.quebec or call 819-732-3254.

What you'll need before applying
1
Site address

The civic address and the cadastral lot number for the parcel.

2
Site plan

A sketch showing where you want the meter, the service entrance and the run-back to the pole or pad-mounted transformer.

3
Service size

The amperage (100 A, 200 A, 400 A…) and voltage you need, with a load calculation signed off by your master electrician.

4
Permits + certification

Municipal building permit from the Ville d'Amos plus the RBQ-issued electrical permit, with a sign-off by your licensed electrician once the in-house wiring is done.

Lead time
4 to 12 weeks

Standard urban residential inside Amos. Industrial-park requests with new substation work can take several months.

Fees
Regie-approved tariff

Service charge + per-metre extension above the contribution threshold, as filed by the city with the Regie.

Once the wires are in and the Service d'electricite has energised the service, your billing account opens automatically under the local residential schedule. There is no separate retailer to sign up with: the city handles the connection, the meter and the bill, the same way Hydro-Quebec handles the rest of the province.

Moving home, transferring or closing a service

Inside Amos, the move-in / move-out conversation is a single call (or a single in-person visit) to the Service d'electricite at city hall. There is no second retailer to coordinate with. Most moves are set up by phone or in person with at least 2 business days' notice. Five days is safer for end-of-month moves.

The move-out steps in order
1
Notify the city

By phone or in person at city hall. Give the move date, the old address and the new one.

2
Confirm dates

2 business days minimum; allow 5 for month-end moves. Same-day disconnections are rare.

3
Final meter read

A city meter reader records the final reading at the property on the move-out date.

4
Final bill arrives

The city issues a closing bill for the period up to the move-out date. The new address bill starts separately at the new account.

Staying inside Amos city limits

Administrative transfer only. No physical work, no service interruption. The Service d'electricite handles the whole move from one address to another inside Amos under the same account number.

Moving outside Amos

Opening a fresh account with Hydro-Quebec is required. The city cannot roll the contract across because the new address is on a different network.

Meters, meter reading and accuracy

The Service d'electricite reads residential meters on a monthly or bimonthly cycle, depending on the route. A growing share of Amos addresses now have AMR (Automated Meter Reading) modules that allow the meter to be read by a drive-by receiver, reducing the need for in-person reads. A small minority still use the older non-AMR mechanical meters that require a meter reader to visit and record the dial reading by hand.

AMR meter
Drive-by readings

Most residential addresses. A city receiver picks up the reading from the street; no walk-up needed.

Suspect a fault?
Request an accuracy test

The Service d'electricite pulls the meter and tests it on a calibrated bench against Measurement Canada's tolerance.

Legacy meter
Manual reading

A small minority of older homes still have non-AMR mechanical meters. A city meter reader visits to record the reading.

How the accuracy test settles up

If the meter reads outside Measurement Canada's tolerance (typically ±2 %), the test is free and you get a billing adjustment. If it passes, the test fee is charged to you at the Regie-approved tariff rate.

Contact finder

What do you need to do with Reseau electrique d'Amos?

Pick an action. The tool shows the right phone, the right link, and what to expect. Nothing is sent anywhere.

Note: under AUC Rule 002, Alberta distributors are not required to pay automatic compensation for outages. Damage claims are evaluated case-by-case on negligence.

Compensation and damage claims: the honest version

This is the section where European-style explainers tend to mislead. Quebec has no automatic, statutory compensation scheme for individual customers affected by a power outage. Unlike the UK's Ofgem Guaranteed Standards (which pay an automatic amount after defined outage durations), the Regie de l'energie's oversight of Hydro-Quebec and the municipal utilities focuses on reliability reporting and rate-design fairness. The penalty for under-performance flows from the regulator into the next rate case, not from the utility to you.

If your fridge or freezer contents spoiled, an appliance was damaged by a voltage surge, or you incurred a clear loss during an outage, you can file a damage claim with the Service d'electricite under its Conditions de service. The claim is evaluated on negligence.

Typically accepted
Distributor at fault
  • +Equipment failure (transformer, switch, cable)
  • +Crew error during work on the network
  • +Switching incident causing voltage spike
  • +Unplanned, distributor-caused service interruption
Routinely denied
Outside distributor control
  • ×Severe weather (wind, ice, freezing rain)
  • ×Wildlife contact (squirrels, birds, raccoons on lines)
  • ×Third-party contact (vehicle hits pole, dig-in)
  • ×Planned outages notified in advance
Faster path for most losses

Most Quebec home insurance policies cover food spoilage and surge damage at a low deductible. If your loss is meaningful, the insurance route is usually faster than a denied utility claim. Keep dated receipts and photos either way. They are the only basis on which a claim can be evaluated.

Regulator and complaint escalation

If you cannot resolve something directly with the Service d'electricite, there is a clear escalation ladder in Quebec. The lead regulator is the Regie de l'energie du Quebec. For some disputes you may also want to involve the Protecteur du citoyen (Quebec's ombudsperson, for procedural fairness questions about a public body) or the Commission d'acces a l'information (for data and access-to-information issues).

The escalation ladder
1
Talk to the Service d'electricite

Most issues resolve here. Call 819-732-3254 or visit the city hall during business hours.

2
Ask for an internal review

If the front line cannot fix it, request a written decision from the service's management. This creates the paper trail needed for the next step.

3
File a complaint with the Regie de l'energie

The Regie accepts customer complaints once you have exhausted the utility's internal process. Free, written submission via the Regie's complaint form.

4
Protecteur du citoyen or court

Last resort. The Protecteur du citoyen can review procedural fairness. Court is rare for residential disputes but available for large damage claims.

Selectra energy expert answers

Can I choose a different electricity supplier than the Reseau electrique d'Amos?

Not for the energy commodity. Quebec is a regulated, vertically-integrated electricity market: inside Amos city limits the municipal Service d'electricite is both the wires-and-poles distributor and the retailer. There are no licensed competitive electricity retailers for residential customers anywhere in Quebec. The only way to be served by a different utility is to live outside Amos, in which case Hydro-Quebec takes over: it covers the rest of the Abitibi-Temiscamingue region and roughly 99 % of the province.

I have a power outage. Who do I call?

Call the Amos electricity service 24/7 at 819-732-3254. Because the network is small and local, dispatch reaches the field crew quickly and a town the size of Amos rarely sees outages that drag on past the storm itself. For a downed live wire or any life-threatening situation, dial 911 first and stay back at least 10 metres. If you live outside Amos city limits, call Hydro-Quebec at 1-800-790-2424 instead.

Why does Amos run its own electric utility?

Because Amos built one before Quebec's network was nationalised. The Town of Amos developed its own small hydroelectric station on the Harricana River in the first half of the 20th century and kept the local distribution network when Hydro-Quebec absorbed most of Quebec's private and municipal utilities in 1944 and again in 1963. Amos, along with eight other municipalities and one cooperative, opted to keep the service in-house. The Service d'electricite is a department of the Ville d'Amos, not a separate company. It is the most northerly municipal electricity utility in Quebec.

Does Amos's utility pay compensation if my food spoils during an outage?

Not automatically. Quebec has no statutory automatic compensation regime for outages, unlike the UK's Ofgem Guaranteed Standards. You can file a damage claim with the Service d'electricite under its Conditions de service, but claims are evaluated case-by-case on negligence and are routinely denied if the outage was caused by weather, wildlife, third-party contact or planned work. Keep dated receipts and photos. Most home insurance policies cover food spoilage and surge damage at a low deductible and are usually a faster route.

How are rates set in Amos?

Rates are approved by the Regie de l'energie du Quebec after the Service d'electricite files a rate case. Because Amos buys its bulk power from Hydro-Quebec at the wholesale Tarif L and resells it on its own network, the local residential rate is benchmarked closely against Hydro-Quebec's standard Tarif D. Quebec's rates are among the lowest in North America thanks to the province's ~95 % hydroelectric generation mix. The current rate schedule is published on the ville.amos.quebec service d'electricite page.

Who do I call for a new connection or service upgrade?

The Service d'electricite of the Ville d'Amos. The utility handles the physical wires, the meter and the connection. Apply at https://www.amos.quebec/services-aux-citoyens/electricite/ or call 819-732-3254. You will typically need a permit from the municipality, an electrical permit (RBQ-licensed work), a load calculation signed by your master electrician, and (for service upgrades) the new panel rating.