What Hydro-Coaticook actually does (and why it dates from 1894)

If you've moved to Coaticook from Montreal, Sherbrooke or anywhere else served by Hydro-Quebec, the first thing to know is that the town of Coaticook has its own municipal electricity service. Hydro-Coaticook is a department of the Ville de Coaticook, not a private company and not a branch of Hydro-Quebec. It owns the local poles, wires, transformers and meters inside the town limits, operates a heritage hydroelectric station on the Coaticook River, restores power after outages, and bills you for both the energy and the delivery on one statement issued by the town.

The historical reason is unusually clear: the Ville de Coaticook began producing and distributing its own electricity in 1894, when electric lighting was still a novelty and the town's textile and grist mills needed local power. That makes Hydro-Coaticook one of the oldest municipal electricity services in Canada, and it predates Hydro-Quebec itself by almost seven decades. Nine Quebec municipalities and one rural cooperative kept their independent networks when Quebec nationalised privately-held electricity companies into Hydro-Quebec in 1963, and Coaticook was one of them. The Coaticook River station still contributes a share of supply today.

Hydro-Coaticook's role
Small generation + distribution + retail
  • Operates a heritage hydroelectric station on the Coaticook River
  • Buys top-up bulk power from Hydro-Quebec at Tarif L
  • Owns the wires, poles, transformers and meters inside Coaticook
  • Bills you for energy and delivery on a town-issued statement
You don't choose a retailer
No competitive market in Quebec
  • ×No "switch retailer" decision for residential electricity
  • ×No commodity contracts, no fixed vs variable plans
  • ×Rates are set by the Regie de l'energie after public review
  • ×Your address determines whether Hydro-Coaticook or Hydro-Quebec serves you

Where Hydro-Coaticook delivers power

In plain words: if your address is inside the Town of Coaticook limits, Hydro-Coaticook is your provider. As soon as you cross into the surrounding MRC de Coaticook municipalities (Compton, Waterville, Barnston-Ouest, East Hereford, Saint-Herménégilde), the network switches to Hydro-Quebec. The simplest way to tell which one you're on is the top of your most recent bill: it will say "Ville de Coaticook" or "Hydro-Quebec" alongside the account number.

~5,400
Customer accounts
Homes, businesses, industry
1894
Founded
Among the oldest in Canada
1 town
Municipalities served
Ville de Coaticook only
Tarif L
Top-up supply
From Hydro-Quebec wholesale
Covered by Hydro-Coaticook
  • •Downtown Coaticook: town centre, commercial streets along Main Street and Child
  • •Industrial zones: historic textile mill area, light manufacturing parks
  • •Residential sectors: every street address within the Ville de Coaticook boundary
  • •Coaticook Gorge sector: addresses inside the town limits near the famous suspension bridge
NOT covered (use these instead)
  • •Compton, Waterville, Barnston-Ouest, Saint-Herménégilde → Hydro-Quebec
  • •Sherbrooke → Hydro-Sherbrooke
  • •Magog → Hydro-Magog
  • •Rural addresses south of the town (East Hereford, Saint-Venant) → Hydro-Quebec

Hydro-Coaticook serves the Town of Coaticook limits only. Crossing the municipal boundary into the surrounding MRC de Coaticook townships hands you over to Hydro-Quebec on the same physical road, sometimes literally from one pole to the next.

Not in Hydro-Coaticook's territory? Pick your distributor

Not sure which one? Check the top of your most recent electricity bill: the utility name (Ville de Coaticook or Hydro-Quebec) is printed alongside your account number.

How Hydro-Coaticook's residential rates work

Because Hydro-Coaticook is a municipal department of the Ville de Coaticook, your bill comes from the town, not from Hydro-Quebec. There is no separate "delivery" line to compare against a commodity price. The retail rate schedule combines own-generation from the Coaticook River station, wholesale supply bought from Hydro-Quebec at the Tarif L wholesale rate, and local distribution into a single per-kWh price, plus a small fixed daily basic charge. The residential schedule broadly tracks the equivalent Hydro-Quebec Tarif D for households, with the Regie de l'energie reviewing the municipal version for fairness.

Basic charge

A fixed amount per day, regardless of consumption. Covers metering, billing infrastructure and customer support. Adds up to a small fixed dollar amount over a typical two-month billing cycle.

Step 1 energy charge

Applies to the first slice of consumption (about 40 kWh per day under the equivalent Hydro-Quebec Tarif D structure). A relatively low per-kWh rate covering baseline heating, lighting and appliances.

Step 2 energy charge

A higher per-kWh rate on every kWh above the Step 1 threshold. Designed to nudge heavier consumers toward conservation, especially in winter when electric heating dominates.

Demand charge (commercial)

For commercial and industrial accounts, a peak-demand component (in kilowatts) is added on top of the kWh charges. Households are not exposed to this.

Hydro-Quebec wholesale (Tarif L)

Built into the retail price you pay: the wholesale Tarif L Hydro-Quebec charges the Ville de Coaticook for the top-up power flowing into the town's network above what the Coaticook River station produces.

GST & QST

Federal GST (5 %) and Quebec Sales Tax (QST, 9.975 %) apply to residential electricity bills. Applied at the bottom of the statement.

Like the rest of Quebec, Coaticook's residential tariff is a two-step inclining block: a lower rate for the baseline daily consumption and a higher rate for the slice above the threshold. Electric heating is the dominant load in this corner of Estrie where winter lows routinely sit at minus-20 to minus-30, so the Step 2 threshold matters: a poorly-insulated home with baseboard heaters tips into Step 2 most months of the heating season, while a well-insulated home with a heat pump may stay almost entirely in Step 1.

The Regie de l'energie reviews every rate change. The current municipal rate schedule is on the Ville de Coaticook site at coaticook.ca; the regulator's own filings are on the Regie de l'energie public registry.

Contact details: emergency line first

For non-urgent questions you can also use the town's online channels: the Ville de Coaticook electricity service page, the town customer service counter at the Hotel de ville, or by mail at the town's mailing address. There is no live outage map for Coaticook; outages are reported by phone and the dispatcher logs them centrally.

Report a power outage

If your power is out anywhere inside Coaticook town limits, the fastest path is to call 819-849-2721. The line is staffed 24/7 by the town's electricity service. You can also report it through the Ville de Coaticook electricity service page. The dispatcher logs the address, cross-references it with field reports, and assigns a crew if the cause isn't already identified.

How it works: from your call to power back on
1
You report it

Call 819-849-2721 or use the town electricity service page. Have your address and account number ready.

2
Dispatch confirms

The dispatcher pinpoints which transformer, feeder or substation is affected and assigns a town crew or pole patrol.

3
Crew restores

Estimated restoration is communicated by phone or back-channel notification. Urban faults: minutes to a few hours. Ice storms and tree-on-line events: longer, with crews working night shifts.

4
Service back

Power is verified at the meter. Reset clocks, check freezer, and report any damage to the town electricity service via the damage-claim form.

Estrie sits inside the freezing-rain corridor that runs from the Adirondacks across the eastern townships. The 1998 ice storm hit Coaticook hard, with broken poles and weeks of outages in some sectors. Today, tree trimming along feeders, pole inspections and transformer replacement programs are scheduled outside the heating season where possible. The compact size of the town network means that, when crews are mobilised, most addresses are reachable within minutes.

Planned outages for maintenance are normally posted in advance by direct notification (letter, postcard or notice at the Hotel de ville) to affected addresses. If you depend on medical equipment, register that with the town's electricity service so you receive priority notification before planned work.

New connection or service upgrade

For a new build, a service upgrade (e.g. moving from 100 A to 200 A to support an EV charger and a heat pump), a temporary construction service, or any work that requires changes to the physical wires or meter inside Coaticook, you deal with Hydro-Coaticook via the Ville de Coaticook. Start at coaticook.ca or call 819-849-2721.

What you'll need before applying
1
Site address

The civic address and the cadastral lot number (numero de lot) for the property.

2
Site plan

A sketch showing where you want the meter, the service entrance and the run-back to the town pole or pad-mounted transformer.

3
Service size

The amperage (100 A, 200 A, 400 A…) and voltage you need, with a load calculation signed off by a CMEQ-certified master electrician.

4
Permits + certification

Ville de Coaticook building permit and the electrical permit issued under the Regie du batiment du Quebec rules, with sign-off by a licensed electrical contractor.

Lead time
4 to 12 weeks

Standard urban residential. New service runs from a new pole or longer extensions can take longer.

Fees
Municipal tariff

Service charge plus a per-metre extension above the contribution threshold under the Conditions de service.

Once the wires are in and the Ville de Coaticook's electricity service has energised the connection, your billing account opens automatically under the municipal residential tariff. There's no separate retailer to sign up with: the town handles the connection, the meter and the bill.

Moving home, transferring or closing a service

In Coaticook, the move-in / move-out conversation is a single call to the Ville de Coaticook's electricity service. There's no second retailer to coordinate with. Most moves can be set up by phone with at least 2 business days' notice. Five days is safer for end-of-month moves.

The move-out steps in order
1
Notify the town

Call the Ville de Coaticook's electricity service. Give them the move date, the old address and the new one.

2
Confirm dates

2 business days minimum; allow 5 for month-end moves. Same-day disconnections are rare.

3
Final meter read

On the move-out date, the town records the final meter reading either remotely (interval meter) or via a meter reader visit.

4
Final bill arrives

The Ville de Coaticook issues a closing bill for the period up to the move-out date. The new address bill opens separately under the same town service.

Staying inside Coaticook

Administrative transfer only. No physical work, no service interruption. The town handles the whole move with one call; you keep the same account number with the Ville de Coaticook.

Moving out of Coaticook

Opening a fresh account with the new utility is required. If you're moving anywhere outside the town limits, you'll most likely be served by Hydro-Quebec — sign up directly with them. The Ville de Coaticook can't roll the contract across.

Meters, meter reading and accuracy

Most municipal utilities in Quebec, including Hydro-Coaticook, have not deployed the full AMI (Advanced Metering Infrastructure) smart-meter rollout that Hydro-Quebec ran province-wide from 2012 to 2020 under the compteurs nouvelle generation program. The Ville de Coaticook's electricity service uses a mix of mechanical and interval meters, with periodic on-site reads by town staff supplementing remote consumption telemetry where available.

Interval meter
Periodic on-site reads

Most residential addresses. Town staff record the meter reading on a defined cycle; in-between bills are estimated if needed.

Suspect a fault?
Request an accuracy test

The town electricity service pulls the meter and tests it on a calibrated bench against Measurement Canada's tolerance.

Self-read
Submit your own reading

If you're going away for an extended period or want to avoid an estimated bill, you can phone in your own meter reading on the scheduled read date.

How the accuracy test settles up

If the meter reads outside Measurement Canada's tolerance (typically ±2 %), the test is free and you get a billing adjustment. If it passes, the test fee is charged to you at the Conditions de service tariff rate.

Contact finder

What do you need to do with Hydro-Coaticook?

Pick an action. The tool shows the right phone, the right link, and what to expect. Nothing is sent anywhere.

Note: under AUC Rule 002, Alberta distributors are not required to pay automatic compensation for outages. Damage claims are evaluated case-by-case on negligence.

Compensation and damage claims: the honest version

This is the section where European-style explainers tend to mislead. Quebec has no automatic, statutory compensation scheme for individual customers affected by a power outage. Unlike the UK's Ofgem Guaranteed Standards (which pay an automatic amount after defined outage durations), the Regie de l'energie's oversight of Hydro-Coaticook focuses on reliability reporting and rate-design fairness. The penalty for under-performance flows from the regulator into the next rate filing, not from the distributor to you.

If your fridge or freezer contents spoiled, an appliance was damaged by a voltage surge, or you incurred a clear loss during an outage, you can file a damage claim with the Ville de Coaticook under its Conditions de service. The claim is evaluated case-by-case on negligence.

Typically accepted
Distributor at fault
  • +Equipment failure (transformer, switch, cable)
  • +Crew error during work on the town network
  • +Switching incident causing voltage spike
  • +Unplanned, distributor-caused service interruption
Routinely denied
Outside distributor control
  • ×Severe weather (ice storms, freezing rain, wind, heavy snow)
  • ×Wildlife contact (squirrels, birds, raccoons on lines)
  • ×Third-party contact (vehicle hits pole, dig-in)
  • ×Planned outages notified in advance
Faster path for most losses

Most Quebec home insurance policies cover food spoilage and surge damage at a low deductible. If your loss is meaningful, the insurance route is usually faster than a denied utility claim. Keep dated receipts and photos either way. They're the only basis on which a claim can be evaluated.

Regulator and complaint escalation

If you can't resolve something directly with the Ville de Coaticook, there's a clear escalation ladder in Quebec. The lead regulator is the Regie de l'energie du Quebec. For some disputes you may also want to involve the Protecteur du citoyen (the Quebec ombudsman, for procedural fairness questions about a municipal body) or the Commission d'acces a l'information (for data and access-to-information issues).

The escalation ladder
1
Talk to the Ville de Coaticook's electricity service

Most issues resolve here. Call 819-849-2721 or visit the customer service counter at the Hotel de ville.

2
Ask for an internal review

If the front line can't fix it, request a written decision from the town's electricity service management. This creates the paper trail needed for the next step.

3
File a complaint with the Regie de l'energie

The Regie accepts customer complaints once you've exhausted the town's internal process. Free, written submission via the Regie complaint form.

4
Protecteur du citoyen or court

Last resort. The Quebec ombudsman can review procedural fairness for a municipal body. Court (Cour du Quebec, Small Claims Division) is available for damage claims under $15,000.

Selectra energy expert answers

Can I choose a different electricity supplier than Hydro-Coaticook?

No. Quebec is a regulated, vertically integrated electricity market with no retail competition. Every address has exactly one electricity provider. Inside the Town of Coaticook limits that provider is Hydro-Coaticook, the municipal department of the Ville de Coaticook, which combines power from its own small hydroelectric station on the Coaticook River with bulk power bought from Hydro-Quebec and resells it at retail tariffs approved by the Regie de l'energie. Outside the town, surrounding Estrie municipalities are served by Hydro-Quebec.

I have a power outage. Who do I call?

Always Hydro-Coaticook at 819-849-2721 for any address inside Coaticook town limits. The line is staffed 24/7 by the town's electricity service. For a downed live wire or any life-threatening situation, dial 911 first and stay back at least 10 metres. If you are outside Coaticook proper (rural MRC de Coaticook addresses), call Hydro-Quebec at 1-800-790-2424 instead.

Why does Coaticook have its own utility instead of Hydro-Quebec?

Coaticook's electricity service dates from 1894, making it one of the oldest municipal electric services in Canada. The Ville de Coaticook built a small hydroelectric station on the Coaticook River in the late 1800s to power the local textile mills and grist mills. When Quebec nationalised privately-held electricity companies into Hydro-Quebec in 1963, Coaticook was one of nine municipalities that already operated their own networks and kept them under the Loi sur la Regie de l'energie. The Coaticook River station still contributes a small share of supply today; the rest is bought wholesale from Hydro-Quebec at the Tarif L.

Does Hydro-Coaticook pay compensation if my food spoils during an outage?

Not automatically. Quebec has no statutory automatic compensation regime for outages, unlike the UK's Ofgem Guaranteed Standards. You can file a damage claim with the Ville de Coaticook under its Conditions de service, but claims are evaluated case-by-case on negligence and are routinely denied if the outage was caused by weather, wildlife, third-party contact or planned work. Keep dated receipts and photos. Most home insurance policies cover food spoilage and surge damage at a low deductible and are usually a faster route.

How are Hydro-Coaticook's rates set?

The Regie de l'energie du Quebec approves Hydro-Coaticook's retail rate schedule after public review. The Ville de Coaticook combines its own small Coaticook River generation with bulk power bought from Hydro-Quebec at the wholesale Tarif L and resells the blend at municipal retail tariffs that broadly track the equivalent Hydro-Quebec residential schedule (Tarif D for households). The Regie publishes every approved rate filing on its public registry at regie-energie.qc.ca.

Who do I call for a new connection or service upgrade?

Hydro-Coaticook. The municipal electricity service handles the physical wires, the meter and the connection inside the town. Apply through the Ville de Coaticook at https://www.coaticook.ca/services-aux-citoyens/hydro-coaticook/ or call 819-849-2721. You will typically need a permit from the town, an electrical permit, a load calculation signed by a CMEQ-certified master electrician, and, for service upgrades, the new panel rating.