What Hydro-Coaticook actually does (and why it dates from 1894)
If you've moved to Coaticook from Montreal, Sherbrooke or anywhere else served by Hydro-Quebec, the first thing to know is that the town of Coaticook has its own municipal electricity service. Hydro-Coaticook is a department of the Ville de Coaticook, not a private company and not a branch of Hydro-Quebec. It owns the local poles, wires, transformers and meters inside the town limits, operates a heritage hydroelectric station on the Coaticook River, restores power after outages, and bills you for both the energy and the delivery on one statement issued by the town.
The historical reason is unusually clear: the Ville de Coaticook began producing and distributing its own electricity in 1894, when electric lighting was still a novelty and the town's textile and grist mills needed local power. That makes Hydro-Coaticook one of the oldest municipal electricity services in Canada, and it predates Hydro-Quebec itself by almost seven decades. Nine Quebec municipalities and one rural cooperative kept their independent networks when Quebec nationalised privately-held electricity companies into Hydro-Quebec in 1963, and Coaticook was one of them. The Coaticook River station still contributes a share of supply today.
- Operates a heritage hydroelectric station on the Coaticook River
- Buys top-up bulk power from Hydro-Quebec at Tarif L
- Owns the wires, poles, transformers and meters inside Coaticook
- Bills you for energy and delivery on a town-issued statement
- ×No "switch retailer" decision for residential electricity
- ×No commodity contracts, no fixed vs variable plans
- ×Rates are set by the Regie de l'energie after public review
- ×Your address determines whether Hydro-Coaticook or Hydro-Quebec serves you
Where Hydro-Coaticook delivers power
In plain words: if your address is inside the Town of Coaticook limits, Hydro-Coaticook is your provider. As soon as you cross into the surrounding MRC de Coaticook municipalities (Compton, Waterville, Barnston-Ouest, East Hereford, Saint-Herménégilde), the network switches to Hydro-Quebec. The simplest way to tell which one you're on is the top of your most recent bill: it will say "Ville de Coaticook" or "Hydro-Quebec" alongside the account number.
- •Downtown Coaticook: town centre, commercial streets along Main Street and Child
- •Industrial zones: historic textile mill area, light manufacturing parks
- •Residential sectors: every street address within the Ville de Coaticook boundary
- •Coaticook Gorge sector: addresses inside the town limits near the famous suspension bridge
- •Compton, Waterville, Barnston-Ouest, Saint-Herménégilde → Hydro-Quebec
- •Sherbrooke → Hydro-Sherbrooke
- •Magog → Hydro-Magog
- •Rural addresses south of the town (East Hereford, Saint-Venant) → Hydro-Quebec
Hydro-Coaticook serves the Town of Coaticook limits only. Crossing the municipal boundary into the surrounding MRC de Coaticook townships hands you over to Hydro-Quebec on the same physical road, sometimes literally from one pole to the next.
Not in Hydro-Coaticook's territory? Pick your distributor
About 99% of the province, including all of the rural MRC de Coaticook outside the town
City of Sherbrooke in Estrie, about 30 km north of Coaticook, the largest municipal utility in Quebec
City of Magog on Lake Memphremagog, also founded around 1894, the closest other municipal utility
Not sure which one? Check the top of your most recent electricity bill: the utility name (Ville de Coaticook or Hydro-Quebec) is printed alongside your account number.
How Hydro-Coaticook's residential rates work
Because Hydro-Coaticook is a municipal department of the Ville de Coaticook, your bill comes from the town, not from Hydro-Quebec. There is no separate "delivery" line to compare against a commodity price. The retail rate schedule combines own-generation from the Coaticook River station, wholesale supply bought from Hydro-Quebec at the Tarif L wholesale rate, and local distribution into a single per-kWh price, plus a small fixed daily basic charge. The residential schedule broadly tracks the equivalent Hydro-Quebec Tarif D for households, with the Regie de l'energie reviewing the municipal version for fairness.
A fixed amount per day, regardless of consumption. Covers metering, billing infrastructure and customer support. Adds up to a small fixed dollar amount over a typical two-month billing cycle.
Applies to the first slice of consumption (about 40 kWh per day under the equivalent Hydro-Quebec Tarif D structure). A relatively low per-kWh rate covering baseline heating, lighting and appliances.
A higher per-kWh rate on every kWh above the Step 1 threshold. Designed to nudge heavier consumers toward conservation, especially in winter when electric heating dominates.
For commercial and industrial accounts, a peak-demand component (in kilowatts) is added on top of the kWh charges. Households are not exposed to this.
Built into the retail price you pay: the wholesale Tarif L Hydro-Quebec charges the Ville de Coaticook for the top-up power flowing into the town's network above what the Coaticook River station produces.
Federal GST (5 %) and Quebec Sales Tax (QST, 9.975 %) apply to residential electricity bills. Applied at the bottom of the statement.
Like the rest of Quebec, Coaticook's residential tariff is a two-step inclining block: a lower rate for the baseline daily consumption and a higher rate for the slice above the threshold. Electric heating is the dominant load in this corner of Estrie where winter lows routinely sit at minus-20 to minus-30, so the Step 2 threshold matters: a poorly-insulated home with baseboard heaters tips into Step 2 most months of the heating season, while a well-insulated home with a heat pump may stay almost entirely in Step 1.
The Regie de l'energie reviews every rate change. The current municipal rate schedule is on the Ville de Coaticook site at coaticook.ca; the regulator's own filings are on the Regie de l'energie public registry.
Contact details: emergency line first
Outages, downed wires, anything dangerous. For a downed live line, call 911 first.
Monday to Friday, 8:30 a.m. to 4:30 p.m. (24/7 outage line)
For non-urgent questions you can also use the town's online channels: the Ville de Coaticook electricity service page, the town customer service counter at the Hotel de ville, or by mail at the town's mailing address. There is no live outage map for Coaticook; outages are reported by phone and the dispatcher logs them centrally.
Report a power outage
If your power is out anywhere inside Coaticook town limits, the fastest path is to call 819-849-2721. The line is staffed 24/7 by the town's electricity service. You can also report it through the Ville de Coaticook electricity service page. The dispatcher logs the address, cross-references it with field reports, and assigns a crew if the cause isn't already identified.
Call 819-849-2721 or use the town electricity service page. Have your address and account number ready.
The dispatcher pinpoints which transformer, feeder or substation is affected and assigns a town crew or pole patrol.
Estimated restoration is communicated by phone or back-channel notification. Urban faults: minutes to a few hours. Ice storms and tree-on-line events: longer, with crews working night shifts.
Power is verified at the meter. Reset clocks, check freezer, and report any damage to the town electricity service via the damage-claim form.
Estrie sits inside the freezing-rain corridor that runs from the Adirondacks across the eastern townships. The 1998 ice storm hit Coaticook hard, with broken poles and weeks of outages in some sectors. Today, tree trimming along feeders, pole inspections and transformer replacement programs are scheduled outside the heating season where possible. The compact size of the town network means that, when crews are mobilised, most addresses are reachable within minutes.
Planned outages for maintenance are normally posted in advance by direct notification (letter, postcard or notice at the Hotel de ville) to affected addresses. If you depend on medical equipment, register that with the town's electricity service so you receive priority notification before planned work.
New connection or service upgrade
For a new build, a service upgrade (e.g. moving from 100 A to 200 A to support an EV charger and a heat pump), a temporary construction service, or any work that requires changes to the physical wires or meter inside Coaticook, you deal with Hydro-Coaticook via the Ville de Coaticook. Start at coaticook.ca or call 819-849-2721.
The civic address and the cadastral lot number (numero de lot) for the property.
A sketch showing where you want the meter, the service entrance and the run-back to the town pole or pad-mounted transformer.
The amperage (100 A, 200 A, 400 A…) and voltage you need, with a load calculation signed off by a CMEQ-certified master electrician.
Ville de Coaticook building permit and the electrical permit issued under the Regie du batiment du Quebec rules, with sign-off by a licensed electrical contractor.
Standard urban residential. New service runs from a new pole or longer extensions can take longer.
Service charge plus a per-metre extension above the contribution threshold under the Conditions de service.
Once the wires are in and the Ville de Coaticook's electricity service has energised the connection, your billing account opens automatically under the municipal residential tariff. There's no separate retailer to sign up with: the town handles the connection, the meter and the bill.
Moving home, transferring or closing a service
In Coaticook, the move-in / move-out conversation is a single call to the Ville de Coaticook's electricity service. There's no second retailer to coordinate with. Most moves can be set up by phone with at least 2 business days' notice. Five days is safer for end-of-month moves.
Call the Ville de Coaticook's electricity service. Give them the move date, the old address and the new one.
2 business days minimum; allow 5 for month-end moves. Same-day disconnections are rare.
On the move-out date, the town records the final meter reading either remotely (interval meter) or via a meter reader visit.
The Ville de Coaticook issues a closing bill for the period up to the move-out date. The new address bill opens separately under the same town service.
Administrative transfer only. No physical work, no service interruption. The town handles the whole move with one call; you keep the same account number with the Ville de Coaticook.
Opening a fresh account with the new utility is required. If you're moving anywhere outside the town limits, you'll most likely be served by Hydro-Quebec — sign up directly with them. The Ville de Coaticook can't roll the contract across.
Meters, meter reading and accuracy
Most municipal utilities in Quebec, including Hydro-Coaticook, have not deployed the full AMI (Advanced Metering Infrastructure) smart-meter rollout that Hydro-Quebec ran province-wide from 2012 to 2020 under the compteurs nouvelle generation program. The Ville de Coaticook's electricity service uses a mix of mechanical and interval meters, with periodic on-site reads by town staff supplementing remote consumption telemetry where available.
Most residential addresses. Town staff record the meter reading on a defined cycle; in-between bills are estimated if needed.
The town electricity service pulls the meter and tests it on a calibrated bench against Measurement Canada's tolerance.
If you're going away for an extended period or want to avoid an estimated bill, you can phone in your own meter reading on the scheduled read date.
If the meter reads outside Measurement Canada's tolerance (typically ±2 %), the test is free and you get a billing adjustment. If it passes, the test fee is charged to you at the Conditions de service tariff rate.
What do you need to do with Hydro-Coaticook?
Pick an action. The tool shows the right phone, the right link, and what to expect. Nothing is sent anywhere.
Note: under AUC Rule 002, Alberta distributors are not required to pay automatic compensation for outages. Damage claims are evaluated case-by-case on negligence.
Compensation and damage claims: the honest version
This is the section where European-style explainers tend to mislead. Quebec has no automatic, statutory compensation scheme for individual customers affected by a power outage. Unlike the UK's Ofgem Guaranteed Standards (which pay an automatic amount after defined outage durations), the Regie de l'energie's oversight of Hydro-Coaticook focuses on reliability reporting and rate-design fairness. The penalty for under-performance flows from the regulator into the next rate filing, not from the distributor to you.
If your fridge or freezer contents spoiled, an appliance was damaged by a voltage surge, or you incurred a clear loss during an outage, you can file a damage claim with the Ville de Coaticook under its Conditions de service. The claim is evaluated case-by-case on negligence.
- +Equipment failure (transformer, switch, cable)
- +Crew error during work on the town network
- +Switching incident causing voltage spike
- +Unplanned, distributor-caused service interruption
- ×Severe weather (ice storms, freezing rain, wind, heavy snow)
- ×Wildlife contact (squirrels, birds, raccoons on lines)
- ×Third-party contact (vehicle hits pole, dig-in)
- ×Planned outages notified in advance
Most Quebec home insurance policies cover food spoilage and surge damage at a low deductible. If your loss is meaningful, the insurance route is usually faster than a denied utility claim. Keep dated receipts and photos either way. They're the only basis on which a claim can be evaluated.
Regulator and complaint escalation
If you can't resolve something directly with the Ville de Coaticook, there's a clear escalation ladder in Quebec. The lead regulator is the Regie de l'energie du Quebec. For some disputes you may also want to involve the Protecteur du citoyen (the Quebec ombudsman, for procedural fairness questions about a municipal body) or the Commission d'acces a l'information (for data and access-to-information issues).
Approves the rate schedules of Hydro-Quebec, Energir, Gazifere and the nine municipal electricity utilities (including Hydro-Coaticook). Reviews applications, oversees reliability reporting and accepts customer complaints. Public proceedings, full document registry.
Free, independent oversight of Quebec public bodies. Looks at procedural fairness and reasonableness when other escalation paths haven't resolved an issue with a municipal department like the Ville de Coaticook's electricity service.
Most issues resolve here. Call 819-849-2721 or visit the customer service counter at the Hotel de ville.
If the front line can't fix it, request a written decision from the town's electricity service management. This creates the paper trail needed for the next step.
The Regie accepts customer complaints once you've exhausted the town's internal process. Free, written submission via the Regie complaint form.
Last resort. The Quebec ombudsman can review procedural fairness for a municipal body. Court (Cour du Quebec, Small Claims Division) is available for damage claims under $15,000.